Index
IN-2
September 2001
7123-A2-GB20-00
D
Data
Port
physical options, 3-13
port connector pin assignments, C-6
Rate (Kbps), 3-32
selection criteria, 2-1
Data Channel Loopback
Network-Initiated, 3-15
Date & Time setting, 3-7
DDS Line statistics, 5-22
Default IP Destination, 3-20
deleting a login, 4-11
Destination, 3-28
Default IP, 3-20
Device
messages, 5-6
troubleshooting problems, 6-8
Dial-In Access, 3-36
disabling SNMP access, 4-7
Disconnect Time (Minutes), 3-23, 3-34
displaying
configuration options, 3-4
identity information, 5-2
LEDs and control leads, 5-3
downloading
determining when completed, 5-26
MIBs and SNMP traps, B-2
software, 5-23, 5-25
DTE
Loopback, 6-17
port connector pin assignments, C-6
port-initiated loopbacks, 3-14
DTLB, 6-17
DTR
down, 6-5
down from Port-1 Device, 5-12
Ignore Control Leads, 3-33
E
EER
at Network, 5-12, 6-5
LED, 5-4–5-5
linkDown trap, B-7
EIA-232C COM Port connector, C-3
ending a session, 2-3
entering system information, 3-7
Enterprise Specific Traps, 3-28, B-9
equipment list, E-1
Escape key, 2-6
ESF Line statistics, 5-19
Ethernet
Initial Route Destination, 3-28
Link Down, 5-12
performance statistics, 5-22
Ethernet port, 3-20
connector pin assignments, C-7
default gateway address, 3-31
MAC address, 5-2
options, 3-30
even parity, 3-32
Excessive Error Rate
linkDown trap, B-7
Threshold, 3-12
External
Device
controlling access, 4-4
Modem
(Com Port) options, 3-36
Commands, 3-36
Transmit Clock, 3-13
F
faceplate, 5-3
field is blank/empty, 2-9
file transfer protocol, 3-24, 5-23
FTP, 5-23
file transfers, 5-23
initiating a session, 5-23
limiting access, 4-4, 4-6
Login Required, 3-24
Session, 3-24, 4-6
function keys, 2-5, 2-7
G
Gateway Address, 5-15
Default, 3-31
General
LEDs, 5-4
options, 3-9
SNMP management options, 3-21
Traps, 3-28
glossary, vi
H
hardware revision
NAM, 5-2
Health and Status messages, 5-12
Hop, 5-15
Summary of Contents for 7123
Page 1: ...7123 SNMP DSU CSU User s Guide Document No 7123 A2 GB20 00 September 2001...
Page 10: ...About This Guide viii September 2001 7123 A2 GB20 00...
Page 22: ...2 User Interface and Basic Operation 2 10 September 2001 7123 A2 GB20 00...
Page 70: ...4 Security and Logins 4 12 September 2001 7123 A2 GB20 00...
Page 116: ...6 Troubleshooting 6 20 September 2001 7123 A2 GB20 00...
Page 136: ...C Connectors Cables and Pin Assignments C 8 September 2001 7123 A2 GB20 00...