![Panoramic Power Energy Insight Installation And Configuration Manual Download Page 20](http://html.mh-extra.com/html/panoramic-power/energy-insight/energy-insight_installation-and-configuration-manual_752028020.webp)
20
Bridge installation and configuration guide
January 2018
© 2018 Centrica plc. Registered office: Millstream, Maidenhead Road, Windsor, Berkshire. SL4 5GD.
Registered in England & Wales No 3033654
Link
LED
Physical Link
(Ethernet/
Wi-Fi/Cellular
Panoramic Power Server
Connected
Off
X
X
Blinking orange -
slow
While
connecting to L2
layer
X
Blinking orange -
fast
While acquiring
IP address
X
Blinking green -
fast
Resolving server
URL
X
Blinking green -
slow
Connecting to
server
X
Solid orange
Authentication
error
✓
(Connection was
established but the
data was rejected by
the cloud)
Solid green
✓
✓
Note: In some cases, it may take up to several minutes for the bridge to obtain an IP address, and at that
stage the Link LED may be off.
It is recommended to wait a few minutes before troubleshooting.