9.
Flow control setting
You will need the pressure test gauge connected to the 10 GPM port. Using the 3/4” deep socket (or similar tool)
and 1/4” hex key, loosen jam nut on the 00141-01 flow control valve and turn adjustment screw clockwise until it
seats. (Do not over tighten)
Turn bottom control valve on and off until pressure remains on gauge. (Approximately 1500 PSI) this pressure will
remain on the gauge until the 00141-01 flow control valve is adjusted.
Slowly turn the adjustment screw counterclockwise until pressure suddenly drops to zero. Tighten the jam nut on
the 00141-01 flow control valve being careful not to turn the adjustment screw. Check the initial setting by turning
the control valve on (full relief 2000-2100 PSI) and off making sure that the pressure drops to zero.
Fig 7.
15 av 34
OPERATION AND MAINTENANCE MANUAL I ENG_OMM_ELECTRIC_POWER_UNIT_P01 I 30th November 2021
@Pandrol 2021