Names and functions
12
5
Names and functions
5.1 The power switch
About power switch:
● When the power switch is turned off automatically, do not turn it on
again. (Consult with sales distributor of Panasonic representatives.)
● When activating a power generator, turn off the power switch.
The connection and disconnection operation of the power source
● Turn the power source switch knob clockwise to connect power
source. About one 1 second later, LED display shows software
version information.
● The software version is shown for about 4 seconds. Then AC
contactor is switched on and cooling fan starts to rotate.
5.2 The output terminal area
Regarding connection and disconnection of the cable, to avoid electric shock and
malfunction, please be sure to cut off the switch of distribution box and then start the
operation.
①
③
②
(-) base metal connection
Connect the base metal cable to the “(-) base metal terminal”.
(
+
) welding gun cable connection
Connect the power cable drawn from the wire feeder to the (+) torch terminal.
control cable socket (16 cored )
Please firmly connect the socket with the wire feeder
※
1
16 cored cable.
Summary of Contents for YD-350GY4
Page 31: ...Operation 28 9 3 CRATER Operation Turn the torch switch on and off twice ...
Page 42: ...Parts list 39 12 Parts list 12 1 Parts list for YD 350GY4 Front view Rear view Top view ...
Page 43: ...Parts list 40 Right view Left view ...
Page 46: ...Parts list 43 12 3 Parts list for YD 500GY4 Front view Rear view Top view ...
Page 47: ...Parts list 44 Right view Left view ...
Page 50: ...Circuit diagram 47 13Circuit diagram 13 1 Circuit diagram for YD 350GY4HJE ...
Page 51: ...Circuit diagram 48 13 2 Circuit diagram for YD 500GY4HJE ...