Turn on the Power of the Unit
1. Insert the power plug to an outlet.
120 V AC 60 Hz, for NTSC model
220 V - 240 V AC 50 Hz for PAL model
Note:
Make sure the power source matches the power
requirement of the model in use.
2. Turn on the POWER switch on the rear of the unit.
The OPERATE indicator will light and the system check
(checking the system and hard disk) will start.
The "WJ-ND300A" indication will be displayed on the
LCD at startup, and the "Initializing" indication will be
displayed while startup. Then, the "System Checking"
indication will be displayed while checking the system.
When the system check is complete, the time and date
display (standby display) will be displayed on the LCD.
Startup display
Time and date display (Standby display)
Important:
When using the optional extension unit (WJ-HDE300
series), turn on the power of this unit after turning on the
power of all extension units.
27
Turn On/Off the Power of the Unit
Operating the Unit for the First
Time
Important:
• When connecting an optional extension unit (WJ-
HDE300 series), turn on the power of the extension unit
before turning on this unit.
1. Turn on the POWER switch.
The OPERATE indicator will light and the system check
(checking the system and hard disk) will start.
The "WJ-ND300A" indication will be displayed on the
LCD at startup, and the "Initializing" indication will be
displayed while checking the system. When the system,
check is complete, the time and date display (standby
display) will be displayed on the LCD.
2. Display the HDD DISK MENU.
After the browser starts, enter the IP address set to this
unit in the address box, and press the enter key. The
HDD DISK MENU will be displayed. Perform the set-
tings with this menu according to your needs. Refer to
the Setup Instructions (PDF) for descriptions of how to
operate the HDD DISK MENU.