20
9.2.7.
Remove the AC inlet
Caution:
To remove AC inlet wait 1 minute after power was off for
discharge from electrolysis capacitors.
1. Disconnect the connector (P9).
2. Remove the screws (
×
1 ,
×
1
) and remove the AC
inlet.
9.2.8.
Remove the P(MAIN)-Board
Caution:
To remove P.C.B. wait 1 minute after power was off for
discharge from electrolysis capacitors.
1. Unlock the cable clampers and the tapes to free the
cables
2. Disconnect the connectors (P2, P6, P11, P35, P52, P56
and P58).
3. Remove the screws (
×
6
) and remove the P(MAIN)-
Board.
9.2.9.
Remove the P(SUB)-Board
Caution:
To remove P.C.B. wait 1 minute after power was off for
discharge from electrolysis capacitors.
1. Unlock the cable clampers and the tapes to free the
cables
2. Disconnect the connectors (P51, P55 and P57).
3. Remove the screws (
×
4
) and remove the P(SUB)-
Board.
9.2.10. Remove the A-Board
1. Unlock the hooks and the tapes to free the cables.
2. Disconnect the connectors (A1, A6, A8A and A12).
3. Disconnect the USB cable (JK8605).
4. Disconnect the flexible cables (A20, A31, A32 and A33).
5. Remove the screws (
×
4 ).
6. Remove the Side shield metal and the Bottom shield
metal.
7. Remove the A-Board.
Summary of Contents for TCP60ZT60
Page 28: ...28 ...
Page 34: ...34 ...
Page 36: ...36 12 3 Wiring 2 ...
Page 37: ...37 12 4 Wiring 3 12 5 Wiring 4 ...
Page 38: ...38 12 6 Wiring 5 ...
Page 39: ...39 12 7 Wiring 6 ...
Page 40: ...40 12 8 Wiring 7 ...
Page 41: ...Model No TC P60ZT60 Exploded View 1 1 3 ...
Page 42: ...Model No TC P60ZT60 Exploded View 2 2 3 ...