3. Remove the Worm.
Fig. 2-6-A
NOTE
1. In case of the Worm installation, check if the value of the
Fig. 2-6-B
is correct.
2. In case of the Loading Motor installation, hook the wire on the
Cassette Opener as shown
Fig. 2-6-C
.
3. When installing the wires between Capstan DD Unit and Loading
Motor, connect them correctly as shown
Fig. 2-6-D
.
Fig. 2-6-B
Fig. 2-6-C
Fig. 2-6-D
13