background image

11

Technical data

Technical Data Sheet   -   Indirect storage tank   -   ErP data

Directive: 2010/30/EU 

Regulation: EU 812/2013 

Directive: 2009/125/EU 

Regulation: EU 814/2013

Water heater Efficiency according to standard: prEN50440 : 2015

M.T. ITEM No.

MODEL/IDENTIFIER

Rating ErP

Heat loss - W

Storage vol.

80341850

PAW-TD 20 C1E5-UK - 1,5kW / 1x230V

A

43

192

80341950

PAW-TD 30 C1E5-UK - 1,5kW / 1x230V

A

49

284

80341951

PAW-TD 30 C1E5HI-UK - 1,5kW / 1x230V

A

49

280

These products are manufactured by OSO Hotwater AS, Industriveien 1, 3300 Hokksund, Norway. 

 Description

Unit

PAW-

TD20C1E5-UK

PAW-

TD30C1E5-UK

PAW-

TD30C1E5HI-UK

Actual capacity of the water tank at 20°C

L.

192

284

280

Outer diameter of the tank

mm

595

595

595

Height of the appliance

mm

1270

1750

1750

Gross weight of the appliance

kg

50

61

65

Net weight of appliance once filled with sanitary water

kg

241

341

345

Material of element

-

incoloy 825

incoloy 825

incoloy 825

Thermal insulation material

-

PUR+VIP

PUR+VIP

PUR+VIP

Thermal insulation of the tank, average thickness

mm

50

50

50

IP classification

-

21

21

21

Standby heat losses / 24 hour

kWh/24h

1.03

1.18

1.18

Standby heat losses

Watts

43

49

49

V40 Hotwater volume

L.

315

465

389

Primary flowrate for Reheat time & Primary heating power

l/h

900

900

900

Heating coil HEX surface

1.8

1.8

2.35

Heating up time heating coil

min

18.5

26.08

18.5

Primary Heating power heating coil

kW

35

32

39.4

Primary Heating coil pressure drop

mbar

120

120

170

Heat up time immersion heater

min

255

464

384

ErP class

-

A

A

A

Pressure information

Design pressure of cylinder (rated pressure)

MPa/Bar

1 / 10

1 / 10

1 / 10

Design pressure of heating coil

MPa/Bar

1 / 10

1 / 10

1 / 10

Operating pressure of cylinder

MPa/Bar

0.3 / 3

0.3 / 3

0.3 / 3

Operating pressure of heating coil

MPa/Bar

0.25 / 2.5

0.25 / 2.5 

0.25 / 2.5

Max. operating temperature of cylinder

°C

70

70

70

Max. operating temperature of heating coil

°C

99

99

99

Hydraulic connections

Secondary return

Inch

3/4”

3/4”

3/4”

Primary Heating coil Flow

Inch

3/4”

3/4”

3/4”

Primary Heating coil Return

Inch

3/4”

3/4”

3/4”

Cold water

Inch

3/4”

3/4”

3/4”

Hot water

Inch

3/4”

3/4”

3/4”

Immersion heater

Inch

5/4”

5/4”

5/4”

T&P valve (factory fitted)

Inch

1/2”

1/2”

1/2”

Temperature sensor sleeve diameter

mm

8

8

8

Electrical characteristics

Supply voltage and frequency

WHz

220-240 VAC

220-240 VAC

220-240 VAC

Power of the electrical resistance

kW

1.5kW@230V

1.5kW@230V

1.5kW@230V

Electrical installation

-

IEEE regs

IEEE regs

IEEE regs

Thermostat type - immersion/cylinder

-

Probe/Probe

Probe/Probe

Probe/Probe

Immersian Heater - Phase

Phase

single

single

single

Immersion thermostat - temp range

°C

8-70

8-70

8-70

Immersion thermostat - set temp

°C

60

60

60

Safety

Safety valve opening pr/- 5%

MPa/Bar

0.8 / 8

0.8 / 8

0.8 / 8

T&P valve opening pressure/Temp.

MPa(Bar) /°C

1/90 (10/90)

1/90 (10/90)

1/90 (10/90)

Safety thermostat cutout - immersion

°C

87

87

87

Safety thermostat cutout - cylinder

°C

80

80

80

Summary of Contents for PAW-TD20C1E5-UK

Page 1: ...e formation in hot water cylinders in accordance with Building Regulation Part L Domestic Heating Compliance Guide This cylinder must be installed by a competent person and be installed in compliance with the Installation and Maintenance Instructions all current legislation codes of practice and regulations governing the installation of unvented hot water cylin ders in force at the date of install...

Page 2: ...ts factory fitted Immersion heater with thermostat and thermal cut out Additional cylinder thermostats with thermal cut out for indirect heat source Temperature and pressure relief valve 1 5 Documentation supplied Installation manual log book 1 6 Supply requirements An uninterrupted 22mm cold water mains supply is recommended however if only a 15mm supply is available this may be used provided the...

Page 3: ...plied 14 Motorised Valve Not factory fitted 15 Expansion Vessel 16 Hot Water Circulation 3 4 BSP 1 6 5 4 3 2 7 16 8 15 13 9 11 10 10 12 A A Y 1 2 3 4 6 66 3 10 Return 3 4 BSP female Flow 3 4 BSP female CW inlet 3 4 BSP female 5 0 Power supply Sensor cable inlet 87 P T valve 1 2 HW outlet 3 4 BSP female Immersion Heater w Thermostat Safety Cut out Housing for Sensor probe Power supply and Sensor ca...

Page 4: ...on relief valve 4 and also from the T P valve 5 and join together in a Tee as shown on page 3 3 1 8 Fit the tundish 6 to the bottom connection of this tee 3 1 9 Connect the cold supply to the multibloc 3 3 1 10 Fit the expansion vessel to the wall close to the water heater using the enclosed mounting bracket Connect the expansion vessel to the multibloc as shown on page 3 3 2 Hot water supply Conn...

Page 5: ...w and return connections should be made connections 1 2 The motorized valve can be connected to either the primary flow or return pipe The primary flow and return fittings are 3 4 BSP female The direction of primary flow in the coil is bottom to top The maximum operating temperature of the primary flow would typically be 82 C 3 6 2 For electrical connection of the motorised valve and immersion hea...

Page 6: ...rought into operation the motorised valve will operate and close down the pri mary flow to the cylinder To reset the safety cut out and the motorised valve the reset button must be pressed in Wiring Diagram Also see S plan and Y plan wir ing page 7 and 8 This product requires a fused permanent Live and Neutral supply 6 4 1 Holiday Mode This is the black button located under the display Press and h...

Page 7: ... as high limit stat only coil the grey temperature probe wire inside additional cylinder thermostat box and insert black probe into thermostat pocket of cylinder then turn dial on front to number 5 Channel running from base of cylinder Pump flow 2 port valve supplied Zone valve not supplied Automatic bypass Radiators UFH HP Boiler Piping Diagram Zone Valve DHW supplied 1 2 2 3 1 T6360B 3 5 7 3 G Y...

Page 8: ...t stat only coil the grey temperature probe wire inside additional cylinder thermostat box and insert black probe into thermostat pocket of cylinder then turn dial on front to number 5 Channel running from base of cylinder 1 2 E 2 3 1 T6360B 3 3 1 4 G O B1 Br G Y N L E N L E N L ST6400 Heat pump Pump 1 2 3 3 2 3 2 2 2 3 1 V4043H Room thermostat Zone Valve DHW supplied Isolated Mains Supply From Fu...

Page 9: ... slow discharge from the tundish occurs when water is being heated In this situation maintenance must be car ried out by competent person and the precharge pressure must be restored to the original value An annual visual inspection is recommended Important To check the precharge the expansion vessel must be completely empty of water If the precharge pressure is different from the value shown on th...

Page 10: ...itch on 2 Immersion heater thermal cut out has operated 2 Check and reset button see thermostat diagram page 8 and safety cut out on page 5 of installation manual 3 Programmer set to central heating or not switched on 3 Check and set to hot water 4 Heat Pump Boiler not working 4 Check Heat Pump Boiler operation If fault suspected consult installer or Heat Pump Boiler manufacturer 5 Cylinder therma...

Page 11: ...5 Primary Heating power heating coil kW 35 32 39 4 Primary Heating coil pressure drop mbar 120 120 170 Heat up time immersion heater min 255 464 384 ErP class A A A Pressure information Design pressure of cylinder rated pressure MPa Bar 1 10 1 10 1 10 Design pressure of heating coil MPa Bar 1 10 1 10 1 10 Operating pressure of cylinder MPa Bar 0 3 3 0 3 3 0 3 3 Operating pressure of heating coil M...

Page 12: ...uropean Drinking Water Directive EN 98 83 EC or latest version The water should not be aggressive i e the water chemistry shall comply with the following Chloride 250 mg L Total Dissolved Solids TDS 500 mg L Saturation Index LSI 80 C 0 8 pH level 9 5 6 0 The immersion heater is not exposed to hardness levels exceeding 20 dH Any disinfection has been carried out without affecting the Product in any...

Page 13: ...ificate that can be accepted as evidence of compliance with the appropriate Building Regulations 3 Failure to install and commission this appliance to the manufacturer s instructions may invalidate the guarantee The above does not affect your statutory rights INSTALLER COMMISSIONING ENGINEER DETAILS INSTALLER DETAILS COMPANY NAME DATE ADDRESS INSTALLER NAME TEL No REGISTERED OPERATIVE ID CARD No I...

Page 14: ...ISCHARGE TESTED IS PRIMARY ENERGY SOURCE CUT OUT FITTED NORMALLY 2 PORT VALVE WHAT IS THE PRESSURE REDUCING VALVE SETTING IF FITTED WHERE IS OPERATING PRESSURE REDUCING VALVE SITUATED NO YES NO bar HAS THE EXPANSION VESSEL OR INTERNAL AIR SPACE BEEN CHECKED YES NO WHAT IS THE HOT WATER TEMPERATURE AT THE NEAREST OUTLET C bar ALL PRODUCTS YES DOES THE HOT WATER SYSTEM COMPLY WITH THE APPROPRIATE BU...

Page 15: ...MENTS SIGNATURE DATE ENGINEER NAME SERVICE 5 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 7 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 9 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 2 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 4 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 6 COMPANY NAME TE...

Page 16: ......

Reviews: