3
B INSTALLATION HARDWARE
The installation hardware (
q
~
a
) packed with the products should include the following:
NO.
NAME
QUANTITY
q
Wood Screw
5
/
32
" × 1
3
/
4
" (5 × 45 mm)
4
w
Toggle Bolts
5
/
32
" × 2
3
/
8
" (5 × 60 mm)
4
e
-a Screw
5
/
32
" × 1
1
/
2
" (5 × 40 mm)
2
e
-b
Screw (For cabinets with recessed bottom)
5
/
32
" × 3
1
/
8
" (5 × 80 mm)
2
r
Flat Washer
2
t
Screw (For E×haust Adaptor)
5
/
32
" ×
3
/
8
" (4 × 10 mm)
2
y
Exhaust Adaptor
1
u
Ventilation Exhaust Cover
2
i
Screw (For Ventilation Exhaust Cover)
1
/
8
" ×
5
/
16
" (3 × 8 mm)
2
o
Metal Brace
1
a
Bracket Assembly (at rear of product)
1
The installation hardware is taped on top of the oven.
C INSTALLATION PROCEDURE
Remove the bracket assembly located on the rear of oven and remove all adhesive tape.
STEP 1: PRE-INSTALLATION CHECK POINTS
120V AC, min. 15A
separated line outlet
*D
12"
30"
Fig. 1
MIN
q
y
w
u
e
-a
i
e
-b
o
r
a
t
• Electric
range:
*D = 30" (76 cm) MINIMUM
• Gas
range:
*D = 32
3
/
8
" (82 cm) MINIMUM
IP2386_38Q01CP_Eng_04_080105.indd 3
IP2386_38Q01CP_Eng_04_080105.indd 3
2009-1-6 Michael 9:16:48
2009-1-6 Michael 9:16:48