Lever of Cassette Up Ass'y set incorrectly.
A. When installing the Front Panel Ass'y, swing the Cassette Door-
Lid all the way open until the Cassette Door tab clears the
Opener Lever.
B. Make sure that all locking tabs are aligned properly.
Then, press the Front Panel straight in.
Fig. D3
3. Installation of VCR Chassis Unit
When installing 2 Screws (S-7), slide the Holder Unit of the
Cassette Up Ass'y (Refer to "
METHOD FOR LOADING/
UNLOADING OF MECHANISM
" in SERVICE NOTES) totighten
screws. Then, slide it back to the EJECTPosition.
Make sure that Mechanism and Cassette Up Ass'y are in the EJECT
Position. (Refer to "
EJECT Position Confirmation
" in
DISASSEMBLY/ASSEMBLYPROCEDURES.)
4. Installation of Mechanism Chassis and Cassette Up Ass'y onto
Main C.B.A.
A. Make sure the Mode Select SW. on the Main C.B.A. is in EJECT
position. If not, rotate the Mode Select SW. until the alignment
projection is in the EJECTPosition.
B. Make sure the Mechanism and Cassette Up Ass'y are in the
EJECTPosition. (Refer to "
EJECT Position Confirmation
"in
DISASSEMBLY/ASSEMBLY PROCEDURES.)
22
Summary of Contents for Omnivision PV-V4600
Page 24: ...5 2 2 Inner Parts Location Fig J1 1 24 ...
Page 25: ...5 2 3 EJECT Position Confirmation Fig J1 2 25 ...
Page 26: ...5 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 26 ...
Page 40: ...5 3 CASSETTE UP ASS Y SECTION 5 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 40 ...
Page 56: ...Fig E3 2 after adjustment 6 4 TEST POINTS AND CONTROL LOCATION 56 ...
Page 59: ...10 2 MECHANISM BOTTOM SECTION 59 ...
Page 60: ...10 3 CASSETTE UP COMPARTMENT SECTION 60 ...
Page 61: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION 61 ...
Page 62: ...10 5 PACKING PARTS AND ACCESSORIES SECTION 62 ...