5.2.5.1. Reassembly Notes
1. Alignment of Main Cam Gear, Drive Rack Arm, and Main Rod
A. Confirm that the hole on Main Rod is a Through Hole with a
hole on chassis.
B. Confirm that the hole on Drive Rack Arm is a Through Hole
with a hole on chassis.
C. Install the Main Cam Gear so that the projection of Main Cam
Gear is in the upward position as shown.
Fig. J3-2
Summary of Contents for OmniVision PV-QV200
Page 24: ...5 2 2 Inner Parts Location Fig J1 1 ...
Page 25: ...5 2 3 EJECT Position Confirmation Fig J1 2 ...
Page 26: ...5 2 4 Grounding Plate Unit Full Erase Head and Cylinder Unit Fig J2 1 ...
Page 40: ...5 3 CASSETTE UP ASS Y SECTION 5 3 1 Top Plate Wiper Arm Unit and Holder Unit Fig K1 1 ...
Page 86: ...10 2 MECHANISM BOTTOM SECTION ...
Page 87: ...10 3 CASSETTE UP COMPARTMENT SECTION ...
Page 88: ...10 4 CHASSIS FRAME AND CASING PARTS SECTION ...
Page 89: ...10 5 PACKING PARTS AND ACCESSORIES SECTION ...
Page 117: ...R3036 ERJ6GEYJ122V MGF CHIP 1 10W 1 2K ...
Page 123: ...ECKATS101MB CERAMIC 20 250V 100P ...