59
9. After all welding processes is done, press nitrogen from compressor and dryer service tubes to check if there any blockage.
10. Blank the service tube on dryer (with welding) and connect the gas charging machine via service tube on compressor for vac-
uuming. (Vacuuming should last at least 45 mins, after vacuuming check the pressure levels for ensuring there is not any
leakage.)
Summary of Contents for NR-B32SG1
Page 2: ...2 1 Safety Precautions ...
Page 3: ...3 ...
Page 4: ...4 ...
Page 6: ...6 3 General Introduction 3 1 Flow of Refrigerant ...
Page 7: ...7 3 2 Flow of Air 3 2 1 Inside the Fridge 3 2 2 Flow of Air Through Air Ducts Front view ...
Page 12: ...12 5 Location of Controls and Components 5 1 Display and Control Panel ...
Page 13: ...13 5 2 Components ...
Page 24: ...24 9 Troubleshooting Guide ...
Page 25: ...25 ...
Page 26: ...26 ...
Page 30: ...30 4 Disconnect all socket connections 5 Remove the main pcb box and take out the main PCB ...
Page 36: ...36 How to replace fan motor Summary ...
Page 74: ...74 12 Dimensions ...