- 7 -
NC-TWS30
Tapping screw
(M3.5 x 12)
(2 pcs.)
Board holder B
Board holder B
Claw
LED holder
2.5. Lamp Ass’y Unit
1. Remove 2 screws off.
2. Remove Board holder B off (Pull Upside).
3. Remove LED Holder off.
4. Lean Board Holder B claw and pull Lamp ass’y unit
to remove.
Operating point
- When remove Lamp ass’y unit, please do in 1 set in
order to not forget Seal Packing F.
Fig. 6
KEEP WARM BOIL
A
2.6. How to Remove Decoration
panel (Display Part)
Open (A Point) with minus screwdriver of small pin.
Fig. 7