16
7
8
Remove the door handle.
Remove the door handle pin.
10.3. Spring Wire
1
2
First remove the spring wire fixing the tub bellows seal
by using the small size screw driver. Pull the tub bellows
seal.
Remove the tub bellows seal-body fixing spring.
10.4. Detergent Drawer
1
2
Gently pull the detergent drawer.
While pressing siphon cover keep pulling drawer to
remove it.
10.5. Control Panel
1
2
Remove the screw which fixes the control panel to the
front panel.
Remove two screws fixing control panel.
Summary of Contents for NA-147VB6WGB
Page 2: ...2 ...
Page 4: ...4 2 3 Dimension in millimetres NA 147VB6 ...
Page 5: ...5 3 Location of Controls and Components ...
Page 9: ...9 5 2 Program Details ...