32
10.26. Tub Entrance with Bellow Hose
1. Remove the tub entrance with bellow hose.
10.27. Pressure Switch Hose Group
1. Remove screw fixing the pressure switch water reservoir.
2. Remove the tub exit with bellow hose with ball by using
box wrench size 10 mm.
10.28. Tub
1. Remove twenty four screws fixing tub using box wrench
size 8 mm.
10.29. Drum
1. Remove the drum.
Summary of Contents for NA-127VB3
Page 3: ...3 1 Safety Precautions ...
Page 6: ...6 4 Location of Controls and Components ...
Page 13: ...13 ...
Page 43: ...43 12 Dimensions ...
Page 44: ...44 13 Wiring Connection Diagram 13 1 Wiring Diagram NA 127VB3 and NA 147VB3 ...
Page 45: ...45 ...
Page 46: ...46 13 2 Wiring Diagram NA 128VB3 and NA 148VB3 ...
Page 47: ...47 ...
Page 51: ...51 14 3 Washing Group Parts 14 3 1 Exploded View Washing Group Parts ...
Page 54: ...54 14 5 Detergent Drawer Group Parts 14 5 1 Exploded View Detergent Drawer Group Parts ...
Page 57: ...57 14 7 Body Group Parts 14 7 1 Exploded View Body Group Parts ...