20
10.4. Spring Wire
1. First remove the spring wire fixing the tub bellows seal by
using the small size screwdriver.
Pull the tub bellows seal as it is shown in the picture.
2. Remove the tub bellows seal-body fixing spring.
10.5. Detergent Drawer
1. Remove the detergent drawer and pull it up carefully.
Summary of Contents for NA-127VB3
Page 3: ...3 1 Safety Precautions ...
Page 6: ...6 4 Location of Controls and Components ...
Page 13: ...13 ...
Page 43: ...43 12 Dimensions ...
Page 44: ...44 13 Wiring Connection Diagram 13 1 Wiring Diagram NA 127VB3 and NA 147VB3 ...
Page 45: ...45 ...
Page 46: ...46 13 2 Wiring Diagram NA 128VB3 and NA 148VB3 ...
Page 47: ...47 ...
Page 51: ...51 14 3 Washing Group Parts 14 3 1 Exploded View Washing Group Parts ...
Page 54: ...54 14 5 Detergent Drawer Group Parts 14 5 1 Exploded View Detergent Drawer Group Parts ...
Page 57: ...57 14 7 Body Group Parts 14 7 1 Exploded View Body Group Parts ...