background image

2

 

n

e

e

r

c

S

1

 

n

e

e

r

c

S

Screen 3

Screen 5

Screen 4

17

* For detailed configuration and management methods, and the 

settings from the ZEQUO assist Plus and the Web screens, please 

see the PDF version of the Operating Instructions on Panasonic’s 

website.

Summary of Contents for M16eG

Page 1: ...f this Switching Hub by customers are not covered by the warranty I0716 20721 Printed in Japan Switch M16eG Installation Guide Model No PN28160K TH PN28160K MY PN28160K ID PN28160K SG 2 12 7 Higashi Shimbashi Minato ku Tokyo Japan 105 0021 2021 The instruction manuals CLI Version Web Version latest firmware and SDN application ZEQUO assist Plus can be downloaded from the following URL https panaso...

Page 2: ...roduct 1 Product Outline 1 1 Features 1 2 Specifications 1 3 Accessories 1 4 Basic operation 2 Part Names and Functions 2 1 LED display change 3 Installation and Configuration 3 1 Mounting to rack 3 2 Configuration of IP address Basic Troubleshooting 3 6 7 7 8 9 9 10 13 15 15 16 18 ...

Page 3: ...as water in places with a lot of humidity in places with conductive dust or in places where there are corrosive and combustible gases Deviation could lead to fire electrical shock and or equipment failure Do not store or use the Switching Hub in places where it will be exposed to direct sunlight or high temperatures The temperature inside will rise which may cause fire Do not store or use the Swit...

Page 4: ... power cord if the STATUS LED blinks in orange system fault Deviation such as keeping connected for a long time could lead to fire Handle the Switching Hub carefully so that fingers or hands may not be damaged by twisted pair port SFP extension slot console port or power cord hook block CAUTION WARNING Do not connect any other devices except for 10BASE T 100BASE TX 1000BASE T devices to the twiste...

Page 5: ...reas the influence rate due to communications failures is extremely high in regard to systems that directly affect systems and human lives which require extremely high reliability It is strongly recommended that a lightning arrester SPD be installed on the twisted pair port side and the power supply side of this Switching Hub Malfunctions might be caused due to overcurrent and overvoltage due to t...

Page 6: ...nvironment in accordance with the specification High humidity Possible spilled liquid water Dusty Possible static charge such as carpet Under direct sunlight Possible condensation High low temperature exceeding the specifications environment Strong vibration and or strong shock Please use this Switching Hub in place where ambient temperature is from 0 to 50 C Failure to meet the above conditions m...

Page 7: ...ooped port after the loop is removed Fanless design solves noise problem or fan failure Due to the ECO mode LED function Port LED lamps left can be turned off to reduce power consumption The IEEE802 1p compatible QoS function is supported Has an internet mansion function which ensures security between each port Due to the loop detection shutoff function a port where loop has occurred can be automa...

Page 8: ...urable up to 8 groups Max 8 ports per group VLAN IEEE802 1Q tagging VLAN 256 groups max Port based VLAN Internet mansion function QoS Port monitoring Management method 1 n Loop detection Ports 1 14 ON Ports 15 16 OFF default setting Port shut off time 60 86400 sec default setting is 60 sec Port history hold time 3 days Power supply AC 100 240 V 50 60 Hz 0 5 A Power consumption Normally Max 13 2 W ...

Page 9: ...ching Hub When this Switching Hub successfully communicates with a terminal connected to a port the Port LED lights up When the terminal is not operating normally for example when power is not supplied to the terminal the Port LED does not light up When the Eco mode is set Port LED lamps do not light up Quantity Optional accessories PN54021K XX 1000BASE SX SFP Module PN54023K XX 1000BASE LX SFP Mo...

Page 10: ... out from the power port Ground terminal Only qualified personnel should install minimum 18AWG green and yellow stranded copper wire to Ground terminal screw 10 100 1000BASE T port ports 1 14 Devices such as 10 100 1000BASE T terminal hub repeater bridge and Switching Hub can be connected to this port Install the device so that the length of twisted pair cable CAT5e or above becomes 100 m or less ...

Page 11: ... Light Operating in status mode Green Blink Operating in ECO mode All Port LEDs left are turned off Orange Light Starting Orange Blink Malfunction Contact the shop Off Power is OFF GIGA GIGA mode LED Green Light Operating in GIGA mode 100M Speed mode LED Green Light Operating in Speed mode FULL DUPLEX mode LED Green Light Operating in DUPLEX mode LOOP HISTORY Loop History mode LED Green Light Oper...

Page 12: ...s or no device is connected 100M Green Light Link is established at 100 Mbps Off Link is established at 1000 Mbps or 10 Mbps or no device is connected FULL Green Light Link is established at full duplex Off Link is established at half duplex or no device is connected Orange Light Shutting down by loop detection Off Not shutting down by loop detection LOOP HISTORY Green Light Loop has been detected...

Page 13: ...mode You can change the Base mode by holding down the LED display change button for at least 3 sec When the Base mode is changed normally all STATUS ECO GIGA 100M and FULL LED lamps light up at the same time When you release the button the Base mode is changed to the selected mode If the mode is changed to the GIGA mode Speed mode DUPLEX mode or loop history mode and the LED display change button ...

Page 14: ...n Table 1 see page 10 Part Names and Functions 2 Turns on the port LED with a orange light when a loop occurs in the corresponding port At this time the relevant port automatically shuts down default setting 60 sec to prevent loop from occurring If the loop is still not removed the port will shut down again Remove the loop while the port is shut down During loop is occurring or if loop has occurre...

Page 15: ...ing the mount brackets and the Switching Hub Fix the mount brackets to the four holes on each side of the Switching Hub using the screws Then securely install the Switching Hub on the rack using the four provided screws for mounting on a 19 inch rack or screws provided with the rack 3 1 Mounting to rack ...

Page 16: ...ect System I P Configuration The screen to enter some addresses is displayed Screen 4 5 Press I to set an IP Address press M to set a Subnet Mask or press G to set a Default Gateway Then enter the specified address Screen 4 6 After completing the settings select Q uit to previous menu twice to return to Main Menu Screen 2 Here select Save Configuration to F lash Screen 5 and the command prompt cha...

Page 17: ... S Screen 3 Screen 5 Screen 4 17 For detailed configuration and management methods and the settings from the ZEQUO assist Plus and the Web screens please see the PDF version of the Operating Instructions on Panasonic s website ...

Page 18: ...loop is occurring or has been removed within 3 days Communications are slow Are the communication speed and mode settings correct If the proper communication mode signal cannot be obtained apply half duplex mode Please reconfirm autonegotiation setting Do not set forced full duplex for the equipment that the Switching Hub is connected to Is not the utilization ratio of the network to which this Sw...

Reviews: