Items
Adjustment
Point
Procedure*
Check
(B)
4.0V Supply
Confirmation
-
1. Confirm that the voltage between TP91 and GND is 4.0V ± 0.2V.
D4,C40,Q9,
R41,R42,C41,
D5,C75,C78,
C69,C66,C67,
(C)
VBACK Status
Confirmation
-
1. Confirm that the voltage between J102 and GND is 0V ± 0.4V.
IC2,Q8,C23,
C24,C25,C26,
C27,C38,R33,
R36,D5,C41,
R41,R42,Q9,
C40,D4,R33,
X1,C32,C33
(D)
*
BBIC
Confirmation
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is shown
below.
IC2,X1,C32,
(E)
*
BBIC Clock
Adjustment
TP1
1. Execute the command "deactmac".
2. Execute the command "conttx".
3. Input Command “rdeeprom_00_00_02”, then you can confirm the current value.
4. Adjust the frequency of TP1 executing the command "setfreq 00 xx (where xx is the
value)" so that the reading of the frequency counter is 10.368000MHz ± 3Hz.
IC2,IC3,L1,
C48,X1,C32,
37
Summary of Contents for KX-TCD410SLS
Page 51: ...18 FREQUENCY TABLE MHz 51 ...
Page 57: ...24 CPU DATA BASE UNIT 24 1 IC2 BBIC 57 ...
Page 61: ...45 MICP A I 61 ...
Page 74: ...74 ...
Page 75: ...30 CABINET AND ELECTRICAL PARTS LOCATION HANDSET 31 ACCESSORIES AND PACKING MATERIALS 75 ...
Page 76: ...32 TERMINAL GUIDE OF THE ICs TRANSISTORS AND DIODES 32 1 Base Unit 32 2 Handset 76 ...
Page 84: ...37 1 Component View 37 2 Flow Solder Side View M KXTCD410SLS KXA141EXS 84 ...
Page 98: ...4 1 5 8 PbF 1 28 18 IC3 IC2 IC1 11 64 1 16 17 32 49 48 33 Marked ...
Page 100: ...Marked PbF IC1 IC2 100 80 5 8 4 1 50 51 30 31 1 11 18 1 28 IC3 ...
Page 102: ...Clip Base PCB G N D S D A S C L 2 7V MODE SDA SCLK GND J104 J103 J102 J101 J100 ...