Items
Adjustment
Point
Procedure*
Check
(B)
4.0V Supply
Confirmation
-
1. Confirm that the voltage between TP91 and GND is 4.0V ± 0.2V.
D4,C40,Q9,
R41,R42,C41,
D5,C75,C78,
C69,C66,C67,
(C)
VBACK Status
Confirmation
-
1. Confirm that the voltage between J102 and GND is 0V ± 0.4V.
IC2,Q8,C23,
C24,C25,C26,
C27,C38,R33,
R36,D5,C41,
R41,R42,Q9,
C40,D4,R33,
X1,C32,C33
(D)
*
BBIC
Confirmation
-
1. BBIC Confirmation (Execute the command "getchk").
2. Confirm the returned checksum value.
Connection of checksum value and program number is shown
below.
IC2,X1,C32,
(E)
*
BBIC Clock
Adjustment
TP1
1. Execute the command "deactmac".
2. Execute the command "conttx".
3. Input Command “rdeeprom_00_00_02”, then you can confirm the current value.
4. Adjust the frequency of TP1 executing the command "setfreq 00 xx (where xx is the
value)" so that the reading of the frequency counter is 10.368000MHz ± 3Hz.
IC2,IC3,L1,
C48,X1,C32,
(F)
*
Hookswitch
Check with DC
Characteristics
-
1. Connect J1 (Telephone Socket) to Tel-simulator which is connected with 600 .
2. Set line voltage to 48V at on hook condition and line current to 40mA.
3. Execute the command "hookoff"
4. Confirm that the line current is 40mA ± 5mA.
5. Execute the command "hookon".
6. Confirm that the line current is 0mA + 2mA.
IC2,R7,R8,
R9,R10,R77,
Q2,Q3,D2,
39