46
Installation Manual
Battery Connection & Charging Information
2. Route the other end of the communication cable from the inverter into
battery enclosure per AHJ requirements.
3. Connect the other end of the supplied battery communication cable to
upper/outer battery RJ-45 connector labeled “UP”.
1. Connect the supplied battery communication cable to the inverter
master RS485 M connector.
RS485M
Connect Communication