52
Installation Manual
Operation and Display Panel
How to Turn the System Off
1.
Turn off the Main Switch (located on the left side of the inverter).
2.
Turn off the battery breaker.
3.
Turn off all AC breakers.
1. Make sure all the connections have been completed and properly
installed.
2. Turn/set the PV Switch, Grid Breaker and Battery Breaker to the on
position.
3. Turn on the Main Switch (located on the left side of the inverter).
4. Press the Enter Key for 3 seconds.
5. Check Load AC output voltage: L-L 240 VAC / L-N 120 VAC.
6. Turn on Load Breaker in the distribution box.
Enter Key
Main Switch
Summary of Contents for EverVolt Standard EVAC-105-4
Page 49: ...49 Installation Manual 11 SAMPLE WIRING DIAGRAM Wiring Diagram EVERVOLT MINI STANDARD PLUS ...
Page 54: ...54 Installation Manual Operation and Display Panel ...
Page 66: ...66 Installation Manual Configuring the Hardware ...
Page 68: ...68 Installation Manual Internet Connectivity Options Included PLC option ...
Page 75: ...75 Installation Manual ...