background image

http://202.224.189.178/~sgml/viewing/EP1014-U1/NA/SVC/s1302000000.html

TOP

 

PREVIOUS

 

NEXT

 

http://202.224.189.178/~sgml/viewing/EP1014-U1/NA/SVC/s1302000000.html (2 of 2) [12/6/2003 9:49:11 AM]

Summary of Contents for EP1014-U1

Page 1: ...g the rear cover 9 2 Removing the massager 10 Disassembly massager and assembly 10 1 Removing the motor 10 2 Removing the tapping shaft assembly 10 3 Removing the gear box 10 4 Removing the massage wheel unit set right left 10 5 Removing and mounting the up sol down shaft bolt 10 5 1 Removing 10 5 2 Mounting 10 5 3 Service Manual TOP NEXT ORDER NO HPD0204U00C1 MASSAGE LOUNGER EP1014 U1 SPECIFICATI...

Page 2: ...1014 U1 Massage heads up down travel Approx 23 5 8 in 600mm Regional back rolling Automatic repetition within approx 4 3 4 in 120mm range Intensity adjustment Adjusts massage head protrusion steplessly within approx 1 3 4 in 45mm range Shoulder position adjustment 5 steps Automatic shut off Approx 15 min Dimensions H x W x D Not reclined and leg rest retracted 41 11 32X34 41 64X40 35 64 in 1050X88...

Page 3: ...g rolling Regional tapping rolling 3 Turning on the power 3 1 Turning on the power 4 Required tools 5 Actual wiring diagram 6 Display method of massage block total use time and operation time 7 Motion of the clutch and belt based on various massager operations 8 Massager up down detection gear adjustment method 9 Removing the massage block 9 1 Removing the rear cover 9 2 Removing the massager 10 D...

Page 4: ...ing 10 5 3 11 Cord arrangement of the connecting cord for power supply and the connecting cord for controller 12 Arranging massage block lead wires 13 Disassembly instruction Cosmetic part and chair construction 13 1 Seat Cushion 13 2 Massage Wheel Cover 13 3 Under Cover 13 4 Caster Pipe Cover 13 5 Power Source Switch Block 13 6 Circuit Board B 13 7 Roller ottoman 13 8 Ottoman Power Lift Unit http...

Page 5: ... Examination after inspection and repairing 14 3 Q A 14 4 Instructions for trouble shooting in response to a customer s claim 15 Trouble shooting 16 Exploded view 17 Replacement parts list for EP1014 U1 http 202 224 189 178 sgml viewing EP1014 U1 NA SVC ep1014u1 html 3 of 3 12 6 2003 9 48 20 AM ...

Page 6: ...6 in 110mm Massage heads up down travel Approx 23 5 8 in 600mm Regional back rolling Automatic repetition within approx 4 3 4 in 120mm range Intensity adjustment Adjusts massage head protrusion steplessly within approx 1 3 4 in 45mm range Shoulder position adjustment 5 steps Automatic shut off Approx 15 min Dimensions H x W x D Not reclined and leg rest retracted 41 11 32X34 41 64X40 35 64 in 1050...

Page 7: ...000 html Maximum user weight 264lbs 120kg 2002 Matsushita Electric Works Ltd All rights reserved Unauthorized copying and distribution is a violation of law TOP NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0000000000 html 2 of 2 12 6 2003 9 48 21 AM ...

Page 8: ...ewing EP1014 U1 NA SVC s0100000000x html 1 Components identification TOP PREVIOUS NEXT 1 1 Massage lounger 1 2 Controller TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0100000000x html 12 6 2003 9 48 23 AM ...

Page 9: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0101000000 html 1 1 Massage lounger TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0101000000 html 1 of 2 12 6 2003 9 48 25 AM ...

Page 10: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0101000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0101000000 html 2 of 2 12 6 2003 9 48 25 AM ...

Page 11: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0102000000 html 1 2 Controller TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0102000000 html 1 of 2 12 6 2003 9 48 27 AM ...

Page 12: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0102000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0102000000 html 2 of 2 12 6 2003 9 48 27 AM ...

Page 13: ... of massage wheels TOP PREVIOUS NEXT 2 1 Upward massage Downward massage Kneading rolling Regional kneading rolling 2 2 Tapping Rolling Regional rolling Tapping rolling Regional tapping rolling TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0200000000x html 12 6 2003 9 48 27 AM ...

Page 14: ...st width 75mm minimum Intensity adjustment Upward and downward massage from gentle to strong 45mm wide adjustability where massage heads push out toward body as intensity increases Others from gentle to strong 15mm wide adjustability where massage heads push out toward body as intensityincreases TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0201000000 html 12 6 2003 9 48 28...

Page 15: ...k to waist Massage range width 3 5 16 in or 4 5 16 in 85mm or 110mm Intensity adjustment Tapping 45mm wide adjustability where massage heads push out toward body as intensity increases Others 15mm wide adjustability where massage heads push out toward body as intensity increases TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0202000000 html 12 6 2003 9 48 29 AM ...

Page 16: ... sgml viewing EP1014 U1 NA SVC s0300000000x html 3 Turning on the power TOP PREVIOUS NEXT 3 1 Turning on the power TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0300000000x html 12 6 2003 9 48 30 AM ...

Page 17: ...er TOP PREVIOUS NEXT Timer When the on off button is pushed a timer begins to prevent overuse After approximately 15 minutes time expires and the massage wheel goes into strage position TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0301000000 html 12 6 2003 9 48 32 AM ...

Page 18: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0400000000x html 4 Required tools TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0400000000x html 1 of 2 12 6 2003 9 48 34 AM ...

Page 19: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0400000000x html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0400000000x html 2 of 2 12 6 2003 9 48 34 AM ...

Page 20: ...p 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0500000000x html 5 Actual wiring diagram TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0500000000x html 1 of 2 12 6 2003 9 48 36 AM ...

Page 21: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0500000000x html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0500000000x html 2 of 2 12 6 2003 9 48 36 AM ...

Page 22: ... power switch and continue to hold the buttons for approximately 5 seconds Release after the on off LED lights up When replacing the Main Circuit PCB the use time is counted to zero because the use time is memoried in Main Circuit PCB When pushing on off button the operation returns to normal mode Display method Display it by utilizing LEDs of controller Time display of 5 5115 hours possible http ...

Page 23: ... operation function After reading the total use time and push the following button you can read the each operation funtion use time as same display method of total use time TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0600000000x html 2 of 2 12 6 2003 9 48 38 AM ...

Page 24: ...0x html 7 Motion of the clutch and belt based on various massager operations TOP PREVIOUS NEXT Massager operation and belt motion Massager operation and clutch motion http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0700000000x html 1 of 2 12 6 2003 9 48 40 AM ...

Page 25: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0700000000x html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0700000000x html 2 of 2 12 6 2003 9 48 40 AM ...

Page 26: ... massager on the lowest position of the back frame 3 Turn the hex nut M6 counterclockwise and move the massager upward 4 Make sure that the massager has been mounted horizontally by moving the massager to the position shown in the Figure Unless the massager has been mounted horizontally an abnormal sound or problem may occur 5 Move it up to the highest position until the massager stops by setting ...

Page 27: ...he manual operation panel of the controller 7 Install the rail piece A and B and tighten uniformly the set screws left and right 3 pcs each 8 Using the manual operation of the controller conduct the rolling operation Set the massage heads adjustment switch to level 1 and check the up down stroke TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0800000000x html 2 of 2 12 6 2003...

Page 28: ...14 U1 NA SVC s0900000000x html 9 Removing the massage block TOP PREVIOUS NEXT 9 1 Removing the rear cover 9 2 Removing the massager TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0900000000x html 12 6 2003 9 48 43 AM ...

Page 29: ...OUS NEXT 1 Unzip the back cushion zipper and remove the back cushion 2 Unzip the rear cover fastener from the bottom of left side 3 Pull the chair down backward and cut insulated ties and remove the plastic clip http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0901000000 html 1 of 2 12 6 2003 9 48 45 AM ...

Page 30: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0901000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0901000000 html 2 of 2 12 6 2003 9 48 45 AM ...

Page 31: ...t position by setting the controller manual operation up down button to DOWN and then turn clockwise the up down clutch hex nut M6 see Figure tomove to the position where the Pinion A and B block is visible from the back frame When the massager fails to move up and down turn clockwise the hex nut M6 of up down clutch The massager can be moved by attaching the hex socket ø10 for nut 6 mm to a recha...

Page 32: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html 2 of 5 12 6 2003 9 48 49 AM ...

Page 33: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html 3 of 5 12 6 2003 9 48 49 AM ...

Page 34: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html 4 of 5 12 6 2003 9 48 49 AM ...

Page 35: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s0902000000 html 5 of 5 12 6 2003 9 48 49 AM ...

Page 36: ...r from the chair please work with the connector cord removed 10 1 Removing the motor 10 2 Removing the tapping shaft assembly 10 3 Removing the gear box 10 4 Removing the massage wheel unit set right left 10 5 Removing and mounting the up down shaft bolt 10 5 1 Removing 10 5 2 Mounting 10 5 3 TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1000000000x html 12 6 2003 9 48 50 A...

Page 37: ...e cable tie medium and remove the motor lead wire connector white 2 Remove the massage belt up down belt and intensity adjustment belt 3 Remove the motor fitting set screw A to D and remove the motor and tapping belt TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1001000000 html 12 6 2003 9 48 51 AM ...

Page 38: ...ensity adjustment block 8 Remove the Pro tektite cover for eccentric link set screws N with a spanner and remove the Pro tektite cover for eccentric link and remove another screw O and the Pro tektite cover for eccentric link 9 Remove the guide plate for motor set screws P to R and the guide plate for gearbox set screws S to V 10 Slide out the tapping shaft assembly with tapping clutch and the gui...

Page 39: ...1014 U1 NA SVC s1002000000 html the other end of spring to hole of Shield panel for PCB C Mount the Shield panel for PCB on massage mechanism http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1002000000 html 2 of 3 12 6 2003 9 48 54 AM ...

Page 40: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1002000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1002000000 html 3 of 3 12 6 2003 9 48 54 AM ...

Page 41: ...r transformer 4 Remove the screw Z and Up down detector P C B Remove the gear box screws a to d 5 After removing the screws the massage clutch up down clutch and intermediate gear block can be removed Take care so that the grease does not stick to the massage clutch and up down clutch pulleys If grease sticks remove it with alcohol The massage clutch and up down clutch have similar shapes The lead...

Page 42: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1003000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1003000000 html 2 of 2 12 6 2003 9 48 56 AM ...

Page 43: ...he massage clutch hex nut so that the massage width is at its minimum 3 Remove the up down shaft bolt of the pinion B block with the box driver and remove the pinion B block 4 Remove the pipe bearing and remove the Massage position plate Take care not to break the Massage position plate 5 Press down the Spring cover toward gear box and keeping press and remove the Fastening spring for shaft Remove...

Page 44: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1004000000 html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1004000000 html 2 of 3 12 6 2003 9 48 58 AM ...

Page 45: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1004000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1004000000 html 3 of 3 12 6 2003 9 48 58 AM ...

Page 46: ...e the up down shaft bolt the box driver Ø13 mm must be used To install the torque wrench with Ø13 mm must be used 2 The torque wrench with Ø13 mm socket and the box driver Ø13 mm are available as parts 10 5 1 Removing 10 5 2 Mounting 10 5 3 TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1005000000 html 12 6 2003 9 48 59 AM ...

Page 47: ...er block left right are secured with the up down shaft bolts Remove them with the box driver Ø13 mm It is possible to use the Phillips head screwdriver But it may deform the screw head Therefore it is necessary to use the box driver TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1005010000 html 12 6 2003 9 49 00 AM ...

Page 48: ...If the up down shaft bolt has been insufficiently tightened it may loosen when the massager moves up and down and the massager may detach from the chair If the up down shaft bolt has been excessively tightened the bolt head may shear Tighten the up down shaft bolt of pinion A and pinion B while controlling the torque TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1005020000 ...

Page 49: ...of two ellipse gear on the intermediate gear block and drive pipe 3 Assemble this block into the Gear box A as they have matched And insert the intermediate gear shaft of intermediate gear block into the groove A of Gear box A When aligning two ellipse gears smooth rotation will not be possible even if the alignment is off by just one tooth During rotation the gears will not match up and may cause...

Page 50: ...ble tie 6 Bind seven wires of intensity clutch up down clutch massage clutch transformer intensity sensor up down sensor and capacitor by using a middle cable tie 7 Bind six wires of intensity clutch up down clutch massage clutch transformer intensity sensor and up down sensor by using a middle cable tie 8 Bind four wires of massage position sensor tapping clutch intensity sensor and up down senso...

Page 51: ...small cable tie on approx 8 in from above binding position Caution during installation Put the massage block at its upper most point Do not allow the cord to ride on top of the frame TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1100000000x html 2 of 2 12 6 2003 9 49 04 AM ...

Page 52: ...9 178 sgml viewing EP1014 U1 NA SVC s1200000000x html 12 Arranging massage block lead wires TOP PREVIOUS NEXT TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1200000000x html 12 6 2003 9 49 06 AM ...

Page 53: ...construction TOP PREVIOUS NEXT 13 1 Seat Cushion 13 2 Massage Wheel Cover 13 3 Under Cover 13 4 Caster Pipe Cover 13 5 Power Source Switch Block 13 6 Circuit Board B 13 7 Roller ottoman 13 8 Ottoman Power Lift Unit TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1300000000x html 12 6 2003 9 49 07 AM ...

Page 54: ...US NEXT 1 Pull out the right and left armrest 2 Pull out four rear head rest guides from the right and left under pipe Please be careful of setting direction of the rear head rest guide as shown figure http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1301000000 html 1 of 2 12 6 2003 9 49 09 AM ...

Page 55: ...202 224 189 178 sgml viewing EP1014 U1 NA SVC s1301000000 html 3 Remove the seat cushion assy TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1301000000 html 2 of 2 12 6 2003 9 49 09 AM ...

Page 56: ...OUS NEXT 1 Detach the plastic clip on safety flap from matte Cut two insulated tie carefully 2 Remove eight screws connecting massage wheel cover and back frame 3 Detach the plastic clip on top of back frame http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1302000000 html 1 of 2 12 6 2003 9 49 11 AM ...

Page 57: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1302000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1302000000 html 2 of 2 12 6 2003 9 49 11 AM ...

Page 58: ... reclining lever and the power source switch block required 1 Pull out the snap pin and take out the link support pin 2 Cut two insulated ties connecting the under cover and the right and left under pipe 3 Cut the insulated tie as shown figure http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1303000000 html 1 of 3 12 6 2003 9 49 13 AM ...

Page 59: ...r pipe And remove two screws from the floor guide and take out the floor guides 5 Remove staples connecting the under cover to the blow cushion left at inside of the power source switch block 6 Unhook the under cover and remove the under cover http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1303000000 html 2 of 3 12 6 2003 9 49 13 AM ...

Page 60: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1303000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1303000000 html 3 of 3 12 6 2003 9 49 13 AM ...

Page 61: ...VIOUS NEXT 1 Remove two screws connecting the caster with the right and left under pipe and take off two casters Cut three insulated ties and remove two floor guides 2 Pull out the caster cover TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1304000000 html 12 6 2003 9 49 15 AM ...

Page 62: ...ke off the controller block from the chair 2 Remove two screws and pull out the power source switch block Take off the connector of power supply and remove screw connecting the grounding lead wire 3 Remove screws and pull out the power source sw bracket If required to replace the fuse after second step pull out the fuse holder and replace the fuse inside http 202 224 189 178 sgml viewing EP1014 U1...

Page 63: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1305000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1305000000 html 2 of 2 12 6 2003 9 49 17 AM ...

Page 64: ...emove a screw on cover for chassis C 2 Cut the calbe tie and remove two screws of fitting B Remove two screws of grounding wires Remove all connectors on circuit board B 3 Take out the circuit board B as shown figure http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1306000000 html 1 of 2 12 6 2003 9 49 18 AM ...

Page 65: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1306000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1306000000 html 2 of 2 12 6 2003 9 49 18 AM ...

Page 66: ...onnector of the ottoman motor 2 Remove two joint cover at upright position of the roller ottoman 3 Remove the unzip the legrest cover 4 Then remove the ottoman cover cloth 5 Unscrew six screws and remove the ottoman housing B http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1307000000 html 1 of 6 12 6 2003 9 49 24 AM ...

Page 67: ...toman pipe cover and cut an insulated tie then pull out the cord 7 Remove two slitted pins and nuts M8 8 Remove six screws assembled in the ottoman bearing housing B and ottoman gear box A http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1307000000 html 2 of 6 12 6 2003 9 49 24 AM ...

Page 68: ...U1 NA SVC s1307000000 html Assemble instructions 1 Set the ottoman pipe cover 2 Set all components on the ottoman inside frame and tie up the cord http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1307000000 html 3 of 6 12 6 2003 9 49 24 AM ...

Page 69: ... Assemble the ottoman housing B 4 Put the ottoman cover cloth on the roller ottoman unit and zip up 5 Set the ottoman roller unit up to the ottoman pipe frame with two nut M8 http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1307000000 html 4 of 6 12 6 2003 9 49 24 AM ...

Page 70: ... s1307000000 html 6 Tie up a cord with the ottoman pipe frame and close the velcro 7 Set two joint covers carefully by using any steel plate as shown figure http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1307000000 html 5 of 6 12 6 2003 9 49 24 AM ...

Page 71: ...tp 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1307000000 html 8 Set the legrest cover TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1307000000 html 6 of 6 12 6 2003 9 49 24 AM ...

Page 72: ...2 Remove two snap pins and take off the hinge pin D and connecting pin 3 Remove the ottoman power lift unit Be careful that the back frame will fall down when removing the ottoman power lift unit When disassembling hold the back frame for safety and preventing from any damage of the back frame http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1308000000 html 1 of 2 12 6 2003 9 49 26 AM ...

Page 73: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1308000000 html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1308000000 html 2 of 2 12 6 2003 9 49 26 AM ...

Page 74: ...her TOP PREVIOUS NEXT 14 1 Grease use 14 2 Examination after inspection and repairing 14 3 Q A 14 4 Instructions for trouble shooting in response to a customer s claim TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1400000000x html 12 6 2003 9 49 27 AM ...

Page 75: ...4 1 Grease use TOP PREVIOUS NEXT Please grease during each repair Acceptable Grease Alvania RA light brown Molycoat white E paste yellow YM103 yellow EM D110 yellow TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1401000000 html 12 6 2003 9 49 29 AM ...

Page 76: ... massage block operates using the controller Check that the massage block operates loaded i e sit in the chair and check Upon finishing repairs when placing the chair make sure that it has enough space to fully recline There should be more than 40cm between the wall and the chair when in the upright position TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1402000000 html 12 6...

Page 77: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1403000000 html 14 3 Q A TOP PREVIOUS NEXT TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1403000000 html 12 6 2003 9 49 31 AM ...

Page 78: ...g EP1014 U1 NA SVC s1404000000 html 14 4 Instructions for trouble shooting in response to a customer s claim TOP PREVIOUS NEXT TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1404000000 html 12 6 2003 9 49 33 AM ...

Page 79: ...ttp 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html 15 Trouble shooting TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html 1 of 6 12 6 2003 9 49 38 AM ...

Page 80: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html 2 of 6 12 6 2003 9 49 38 AM ...

Page 81: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html 3 of 6 12 6 2003 9 49 38 AM ...

Page 82: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html 4 of 6 12 6 2003 9 49 38 AM ...

Page 83: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html 5 of 6 12 6 2003 9 49 38 AM ...

Page 84: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1500000000x html 6 of 6 12 6 2003 9 49 38 AM ...

Page 85: ...202 224 189 178 sgml viewing EP1014 U1 NA SVC s1600000000x html 16 Exploded view TOP PREVIOUS NEXT TOP PREVIOUS NEXT http 202 224 189 178 sgml viewing EP1014 U1 NA SVC s1600000000x html 12 6 2003 9 49 39 AM ...

Page 86: ...L9557 SCREW Cup S M4 16 1 6 9 WEP2000L1447 PINION B BLOCK 1 10 WEP596L6057 UP DOWN SHAFT BOLT 1 11 WEP596L3538 FITTING 1 12 WEP545H1937 GUIDE ROLLER B 1 13 WEP578AL0317 RUBBER RING 1 2 14 WEP596L0328 PIPE 1 15 WEP1015L0458 MASSAGE POSITION PLATE 1 16 WEP578L0167 FASTENING SPRING FOR SHAFT 1 2 17 WEP578L0387 SPRING COVER 1 2 18 WEP578L0197 SPRING 1 2 19 WEP755L1187 MASSAGE WHEEL UNIT SET 1 20 WEP75...

Page 87: ...ITTING B 1 40 WEP2000L1467 UP DOWN GEAR 1 41 WEP578AL1907 UP DOWN SHAFT SPRING 1 42 WEP545H1917 GUIDE ROLLER A 1 43 WEP750L0837 SPACER FOR GUIDE ROLLER 1 44 WEP760L0147 PLATE TYPE SPRING 1 45 WEP2000L4637 INTERMEDIATE GEAR BLOCK 1 46 WEP760L1767 GEAR BOX A 1 47 WEP2000L0377 UP DOWN SHAFT 1 48 WEP596L3417 UP DOWN BELT 1 49 WEP578AL1307 IDLER PULLEY BLOCK 1 50 WEP1800L1657 CIRCUIT BOARD SPACER 1 51 ...

Page 88: ...5W8537 INSULATED TIE MEDIUM T30 SF 1 74 WEP004W8507 INSULATED TIE SMALL 1 75 WEP004W8517 INSULATED TIE MEDIUM 1 76 WEP589L0218 CORD GUIDE FRAME 1 77 WEP596L0237 GUIDE PLATE FOR MOTOR 1 78 WEP596L0187 GROUND SPRING C 1 79 WEP596L6087 SCREW BIND TP B4 48 1 3 80 WEP596L1778 TAPPING GEAR BOX AB SET 1 81 WEP569L6857 E TYPE STOP RING 1 82 WEP579L1490 TAPPING CLUTCH 1 83 WEP569L1147 TAPPING BELT A 1 84 W...

Page 89: ... SEAT CUSHION ASSY NAVY BLUE Aromat 1 105 WEP1010K3708 RIGHT ARM REST BLACK Aromat 1 105 WEP1010T3708 RIGHT ARM REST BROWN Aromat 1 105 WEP1010G3708 RIGHT ARM REST GREEN Aromat 1 105 WEP1014T3708 RIGHT ARM REST TAUPE Aromat 1 105 WEP1014N3708 RIGHT ARM REST NAVY BLUE Aromat 1 106 WEP1010K3698 LEFT ARM REST BLACK Aromat 1 106 WEP1010T3698 LEFT ARM REST BROWN Aromat 1 106 WEP1010G3698 LEFT ARM REST ...

Page 90: ... REST CUSHION ASSY TAUPE Aromat 1 111 WEP1014N3158 LEG REST CUSHION ASSY NAVY BLUE Aromat 1 112 WEP1014K3167 OTTOMAN PIPE COVER ASSY BLACK Aromat 1 112 WEP1014B3167 OTTOMAN PIPE COVER ASSY BROWN Aromat 1 112 WEP1014G3167 OTTOMAN PIPE COVER ASSY GREEN Aromat 1 112 WEP1014T3167 OTTOMAN PIPE COVER ASSY TAUPE Aromat 1 112 WEP1014N3167 OTTOMAN PIPE COVER ASSY NAVY BLUE Aromat 1 113 WEP1022L0858 CENTER ...

Page 91: ...1917 JOINT COVER 2 142 WEP1014L1878 OTTOMAN HOUSING B 1 143 WEP2010L1857 OTTOMAN BEARING HOUSING B 1 144 WEP528L0387 UNIVERSAL BEARRING 1 145 WEP2010L1867 OTTOMAN BEARING HOUSING A 1 146 WEP2010L1887 OTTOMAN GEAR BOX A 1 147 WEP1014L2108 OTTOMAN MOTOR 1 148 WEP2100L4617 OTTOMAN ROLLER 1 149 WEP2010L1897 OTTOMAN GEAR BOX B 1 150 WEP2010L0367 OTTOMAN INSIDE FRAME 1 151 WEP1014L1908 OTTOMAN HOUSING A...

Page 92: ...W M4X16 1 24 174 WEP50380357 SNAP PIN 1 5 175 WEP1015L6058 BOLT WASHER 1 2 176 WEP1010K9008 SCREW M5X12 1 Aromat 6 177 WEP760L0907 HINGE PIN A 1 2 178 WEP1010L9118 SCREW M3X12 1 2 179 WEP1014K9078 SCREW M3X45 Aromat 1 180 WEP1010L9098 SCREW M4X8 1 Aromat 9 181 WEP1010L9058 HEX SCREW K4X6 1 Aromat 4 182 WEP1010L9038 SCREW K5X16 1 2 183 WEP578N6227 SCREW M6X10 1 12 184 WEP1010L6558 HEX BOLT M6X12 1 ...

Page 93: ...0L0937 HINGE PIN D 1 200 WEP1015L8508 CABLE TIE PLT1M M 1 14 201 WEP1014L1768 ROLLER ASSEMBLY 1 WEP1014L8100 OPERATING INSTRUCTION Aromat 1 WEP1014K8008 INDIVIDUAL PACKAGE BLACK Aromat 1 WEP1014B8008 INDIVIDUAL PACKAGE BROWN Aromat 1 WEP1014G8008 INDIVIDUAL PACKAGE GREEN Aromat 1 WEP1014T8008 INDIVIDUAL PACKAGE TAUPE Aromat 1 WEP1014N8008 INDIVIDUAL PACKAGE NAVY BLUE Aromat 1 WEP000S8857 TORQUE WR...

Page 94: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 49_01u gif http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 49_01u gif 12 6 2003 9 49 47 AM ...

Page 95: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 50_01u gif http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 50_01u gif 12 6 2003 9 49 49 AM ...

Page 96: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 51_01b gif http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 51_01b gif 12 6 2003 9 49 51 AM ...

Page 97: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 52_01b gif http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 52_01b gif 12 6 2003 9 49 53 AM ...

Page 98: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 53_01b gif http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 53_01b gif 12 6 2003 9 49 55 AM ...

Page 99: ...http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 54_01u gif http 202 224 189 178 sgml viewing EP1014 U1 NA SVC 54_01u gif 12 6 2003 9 49 57 AM ...

Reviews: