28
7 Troubleshooting Guide
7.1.
Service and Check Procedures
7.1.1.
Servicing flow
• The following is the servicing procedure including assembly/disassembly process.
• As for the air-leak test, refer to "7.2. Air-leak Test".
<NOTE>
Air-leak test (inspection) before taking service measure:
• When the first inspection, do not perform cleaning (removal of foreign objects caught etc.) of the waterproof packing parts (bat-
tery door and Jack door) from the viewpoint of the cause investigation at NG of test (inspection) result.
• When the test (inspection) result was NG, perform test again after cleaning of waterproof packing parts.
Summary of Contents for DMC-FT1EB
Page 15: ...15 4 Specifications ...
Page 16: ...16 ...
Page 18: ...18 ...
Page 19: ...19 ...
Page 20: ...20 ...
Page 21: ...21 5 Location of Controls and Components ...
Page 22: ...22 ...
Page 31: ...31 7 2 Air leak Test ...
Page 32: ...32 7 3 Air leak Test Inspection ...
Page 33: ...33 ...
Page 37: ...37 9 Disassembly and Assembly Instructions 9 1 Disassembly Flow Chart 9 2 PCB Location ...
Page 39: ...39 9 3 2 Removal of Top Ornament Fig D2 Fig D3 ...
Page 40: ...40 9 3 3 Removal of Rear Case Unit Fig D4 Fig D5 ...
Page 42: ...42 Fig D7 9 3 5 Removal of Main P C B Battery Case Fig D8 ...
Page 43: ...43 Fig D9 9 3 6 Removal of Main P C B Fig D10 ...
Page 44: ...44 Fig D11 9 3 7 Removal of Flash P C B Fig D12 ...
Page 45: ...45 9 3 8 Removal of Top P C B Fig D13 Fig D14 ...
Page 46: ...46 9 3 9 Removal of Rear Operation P C B Fig D15 Fig D16 ...
Page 47: ...47 Fig D17 9 3 10 Removal of LCD Unit Fig D18 ...