Step 20: Make sure the trigger link spring is hooked underneath
the catch.
•
Assembly of Change Lever and Change Gear
Step 21: Slot the change gear onto the change lever.
Step 22: Align change gear to the shaft and snap both bosses
of the change lever to the hooks.
•
Assembly of Cam Gear
Step 23: Adjust both parts to align with the underneath holes.
Step 24: Align the holes and press down until it “click”.
54
CR14C
Summary of Contents for CR14C
Page 2: ...1 Mechanism Overview 2 CR14C ...
Page 7: ...7 CR14C ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14C ...
Page 14: ...8 2 1 Flow operation 14 CR14C ...
Page 15: ...15 CR14C ...
Page 41: ... Disassembly of Load Plate Step 25 Position load plate as picture shown to remove it 41 CR14C ...
Page 60: ...60 CR14C ...
Page 62: ...CR14C 62 ...
Page 66: ...CR14C 66 ...
Page 67: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14C 67 ...
Page 68: ...CR14C 68 ...