8 CR14 Mechanism Reliability
Purpose: To test the CR14C mechanism unit operation by using the Reliability P.C.B. before installation into the main unit.
8.1. Setup Connection
Below diagram shows the set-up necessary to carry out the reliability of mechanism.
Equipments required for the set up preparation:
- Power supply
- Reliability P.C.B. (RFKZCR14)
12
CR14C
Summary of Contents for CR14C
Page 2: ...1 Mechanism Overview 2 CR14C ...
Page 7: ...7 CR14C ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14C ...
Page 14: ...8 2 1 Flow operation 14 CR14C ...
Page 15: ...15 CR14C ...
Page 41: ... Disassembly of Load Plate Step 25 Position load plate as picture shown to remove it 41 CR14C ...
Page 60: ...60 CR14C ...
Page 62: ...CR14C 62 ...
Page 66: ...CR14C 66 ...
Page 67: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14C 67 ...
Page 68: ...CR14C 68 ...