Step 21: Fix switch rod, ensure the switch rod’s guide seat
properly onto the groove.
•
Assembly of Traverse Unit Assy
Step 22: Slide TRV slide plate assy to the end.
Step 23: Turn over the UD base, release catch and push the
guide of the TRV slide plate as arrows shown.
Step 24: Ensure both grooves are open.
Step 25: Ensure the OPU sub rack is below the guide line.
46
CR14C
Summary of Contents for CR14C
Page 2: ...1 Mechanism Overview 2 CR14C ...
Page 7: ...7 CR14C ...
Page 13: ...8 2 Jig s Flow Diagram 13 CR14C ...
Page 14: ...8 2 1 Flow operation 14 CR14C ...
Page 15: ...15 CR14C ...
Page 41: ... Disassembly of Load Plate Step 25 Position load plate as picture shown to remove it 41 CR14C ...
Page 60: ...60 CR14C ...
Page 62: ...CR14C 62 ...
Page 66: ...CR14C 66 ...
Page 67: ...15 Exploded Views 15 1 Cabinet Parts Location and Grease Drysurf Location CR14C 67 ...
Page 68: ...CR14C 68 ...