2.3.19. The order of tightening screw of Each Unit
After servicing, tighten the screwsin the following sequence.
1. Tightening the screws of the LCD Unit.
1-1.Tighten DXYN3+J5FNL(J). No.1, No.2
1-2.Tighten XTB26+10GFN(H). No.3, No.4
Screw (H)
Screw (J)
Screw (J)
Screw (H)
2. Tightening the screwsof the Bottom Case Ass’y
After holding down area (A):
2-1.Tighten DXHM0039ZA(B). No.5-No.10
2-2.Tighten DXHM0057ZA(D). No.11-No.13
2-3.Tighten DFHE5025XA(C). No.14
2-4.Tighten DXHM0057ZA(D). No.15-No.16
Screw (C)
Screw (D)
Screw (D)
Screw (D)
Screw (B)
Screw (D)
Screw (B)
Screw (B)
Screw (D)
Screw (B)
Screw (B)
Screw (B)
A
Keeo the SIde Cover pressed
toward the inside and back
while tightening the screws
Keep the Side Cover pressed toward the
inside and back while tightening the screws
2
-21
Summary of Contents for CF-Y4 - Batt For
Page 2: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 98: ...Main Board Power SW Board Open SW Jack Board 1 3 5 7 2 4 6 8 B D F H J L A C E G I K ...