
2.3.8. Line processing of Modem Cable and the order of tightening screw of MDC
Modem
MDC Modem Surface side
MDC Modem back side
Screw A
Modem Cable
Connector
insertion
MDC Modem
The order of tightening Screw: A
B
MDC tape putting specification
Screw B
MDC Tape
MDC Modem
Tape
MDC Tape
Hold Tag Part and put the MDC Tape.
Put the MDC Yape, extend to both sides of MDC Modem.
Tag Part
2.3.9. Assembly of Power Knob
Screw
Screw
Screw
Power Knob
Front PWB
Right adjust
Insert in the ditch part of the power knob.
2-15
Summary of Contents for CF-Y4 - Batt For
Page 2: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 98: ...Main Board Power SW Board Open SW Jack Board 1 3 5 7 2 4 6 8 B D F H J L A C E G I K ...