background image

30

Remove skyroof control box in gutter and 
find out RGB Led cabling instructions at 
the back of control box.

Black cable is for RGB Led Lighting 

which has water proof socket.

Open socket from middle, you will find marks
( Terminal 1,2 , PE and N) on that.

One side of socket has marks, other side has cable connection

Fix cables according to instructions on control board

Summary of Contents for Skyroof Plus

Page 1: ...1 Installation Manual Skyroof Plus...

Page 2: ...nd exact installation of our product We recommend you to read our instruction carefully During installation all necessary actions have to be carried out by authorized and specialized technicians All u...

Page 3: ...46 39 53 54 1 Symbols Precautions and Warnings 2 Terminology 3 Packaging 4 Installation Steps 6 Sensors and Automation 7 Hardware 8 Tools 9 Frequently Asked Questions 10 Risk Table 5 Programming Reset...

Page 4: ...people or animals or property It is forbidden to tamper to bioclimatic pergola system General Precautions Before starting of any assembly maintenance or cleaning operations make sure that you have ful...

Page 5: ...5 2 TERMINOLOGY...

Page 6: ...120V or 230V 50 60Hz Linear Actuators provide the movement of bioclimatic pergolas Linear Actuators are located on lateral Integrated Gutter see below Also each linear actuator has to be synchronized...

Page 7: ...starting their assembly check the integrity of the material and the presence of all the components necessary for the installation In case of anomalies immediately stop the work and contact with hospit...

Page 8: ...M3x16mm Rounded Head Screw 4 3 Panel Cover 2 4 Panel Bottom Gasket 1 5 Panel Gasket 1 6 Panel Profile 1 7 Power Pin 2 3 2 3 Pillars BOM ID Description Qty 1 150x150x3mm Pillar CNC Operated for connect...

Page 9: ...unting brackets Pillar caps It has a blue label on the box 3 Plastic Box Corner Plastics ELECTRIC METAL PLASTIC 3 2 4 Boxes 1 Electrical Box Remote Controls Sensors Automations are on Electric box It...

Page 10: ...ould be drilled with 16 mm drill The bracket must away 35cm 1 2 from the corner Brackets should be fixed for every 150cm 5ft 35cm 1ft 150cm 5ft 150cm 5ft Product width 35cm 1ft 150cm 5ft 150cm 5ft Pro...

Page 11: ...11 Fasten of the M12 steel rod to the wall and tighten of rods Place the Integrated gutter to the wall mounting bracket...

Page 12: ...d wall mounting bracket Important All screwing should be discarded after product size control The Final view 4 1 3 Ceiling installation Define to ceiling mounting bracket position on the ceiling and m...

Page 13: ...Integrated gutter to the ceiling mounting bracket M20x50mm screw Ceiling Mounting Bracket M20 Nut M20 Steel Rod Washer for M20 Screw Rear Integrated Gutter M20x50mm screw Ceiling Mounting Bracket M20...

Page 14: ...th side and Rear Integrated Gutter on ground with M10 Sealed Nut as you see in below figure M10 Washer Stainless Steel M10 Nut Stainless Steel M10 Washer Stainless Steel M10 Nut Stainless Steel Sealan...

Page 15: ...t below figure Rear Integrated Gutter Left Side Lateral Integrated Gutter Rear Integrated Gutter Left Side Lateral Integrated Gutter Linear Actuator placed on the back side on lateral integrated gutte...

Page 16: ...16 The fixing Lateral side integrated gutter to rear integrated gutter with M10 Sealed Nut 4 1 5 Cross Check and Level Control...

Page 17: ...place the stainless steel anchorage to marked location For flange installation please refer to freestanding model First of all define to exact pillar position and mark it 4 1 6 Pillar Fixing 4 1 6 1 S...

Page 18: ...rstly fix the hidden anchorage to the ground with 4 M12 and chemical dowels Then put the washers and nuts on the rods from inside and tighten them Put the inner cover and apply sealant to the sides Pl...

Page 19: ...ng the panels start front panel First panel has a gasket for perfect insulation 4 2 Panel Installation Start place from front panel Start place from front panel The front panel has a gasket for perfec...

Page 20: ...he gutter profile The front panel has a short pin as last 3 panels The front panel has a short pin as last 3 panels Place the middle panels to escalloped lateral side integrated gutter which is shown...

Page 21: ...vent the pins from striking the linear actuator Pannel s lighting cable should be inside of this plastic cover Pannel s lighting cable should be inside of this plastic cover The last 3 panel pins are...

Page 22: ...22 Place rear covering to rear integrated gutter...

Page 23: ...efined at below Motor konulduktan sonar enerji verilmeli Kalibrasyon yap l p programlama yap lmal Programlama b l m ne y nlendir Please refer to Programming section 40x20mm Aluminium profile must be c...

Page 24: ...k the 40x20mm Aluminium profile must use to snap ring It has to be placed to channel of the panel pin Place and fasten to clamp for last 3 panels Pin house direction should be from outside to inside a...

Page 25: ...give energy to control box and press calibration button 2 Then you need to connect to remote control Please check programming 3 To allign holes of 40x20 profile and actuator profile move actuators fro...

Page 26: ...26 4 4 Back covering for wall installation Place the back covering profile Z bended...

Page 27: ...rojection bigger than 579 9cm 19 or you want to add a middle pillar to the structure it will be able to connect with U bracket as you see in below picture Middle pillar Middle pillar When you fix a U...

Page 28: ...module these modules are not welded to the pillar That brackets and pillars will be sent separately 4 6 2 4 Module and Pillar connection 4 6 1 2 Module and pillar connection 4 7 Perimeter Lighting Ins...

Page 29: ...ofile should be located on 6mm 15 64 top of the integrated gutter Place perimeter lighting profile Cap to related house on perimeter lighting profile Place corner plastic between perimeter lighting pr...

Page 30: ...at the back of control box Black cable is for RGB Led Lighting which has water proof socket Open socket from middle you will find marks Terminal 1 2 PE and N on that One side of socket has marks othe...

Page 31: ...31 4 8 Corner Cap Place the Corner Cap on the top of the integrated gutter s joint point...

Page 32: ...tly should be provided Power only needs to be supplied to the Control Unit Box The receiver is completely enclosed inside the Control Unit Box PALMIYE Reserves the right to void the motor warranty if...

Page 33: ...erent remote control models Pure Patio Lounge Modulis Situo 1 RTS has only one channel It means it can control 1 RTS motor Situo 5 RTS has 5 channels It means it can control 5 different RTS motor Teli...

Page 34: ...ight 145 151 Colour Silver Silver Pure Compatibility Compatible with a range of Somfy RTS enabled products Radio Frequence For indoor use Radio Range 433 42 MHz Protection Index 200m in open field or...

Page 35: ...35...

Page 36: ...button simultaneously Both lighting system will TURN ON Step 3 Press PROG button on your remote control IMPORTANT NOTE At this stage if there is only one of these systems the lighting programming proc...

Page 37: ...5 6 RGB Led Programming Press the programming button on the panel for 5 seconds then press the programming button on the back of the remote for 2 seconds 5 7 Motor Calibration The motors must be calib...

Page 38: ...panels MY button It stops the motor from running and ensures that the panels remain where they are 5 9 3 Transfer the channel on the current remote control to a different remote control Step 1 On the...

Page 39: ...l motors Enter the learning mode Press more than 2 seconds on the programming button of a RTS control which is already memorized in the motor Press briefly on the prog button of the EOLIS RTS Sensor T...

Page 40: ...otor must be in programming mode to record a SOLIRIS RTS Sensor One SOLIRIS RTS Sensor can be memorized into several motors It isn t recommended to memorize more than 1 SOLIRIS RTS Sensor into motor s...

Page 41: ...of sensor press briefly the Mode button if LED lights ready for use FEATURES Up to 3 sensors can be memorized in one motor it could be combined with other RTS sensors EOLIS RTS SOLIRIS RTS One Sunis s...

Page 42: ...support SUN FUNCTIONNING Use the Telis with sun function to activate or deactivate the sun function Telis Soliris RTS Telis Modulis Soliris RTS Manual Mode Sun function deactivated Automatic mode Sun...

Page 43: ...S Rain sensor has a two cable output One cable must go to main voltage 230V 50Hz and other is to dry contact signal cable You must joint rain sensor dry contact cable to RS485 s channel input jacks fr...

Page 44: ...pin code which is below of the Connexoon transmitter Read and Skip information tabs Click 3 line on left top Click configuration Click add button Select your product Program to your product Give a nam...

Page 45: ...RTS transmitter or Dry contact Transmitter until the motor jogs The product is assigned to the transmitter It can up to 16 groups of Somfy RTS motors and receivers Press the programming button on the...

Page 46: ...illing screw M8x25mm Bolt Wall Mounting Bracket Rear Integrated Gutter M12 Steel rod M4 8x25mm self drilling screw M8x25mm Bolt Wall Mounting Bracket Rear Integrated Gutter 7 HARDWARE 7 1 Integrated g...

Page 47: ...r for M20 screw Ceiling Mounting Bracket Rear Integrated Gutter M20 Steel Rod M20 Nut M20x50mm screw Washer for M20 screw Ceiling Mounting Bracket Rear Integrated Gutter M20 Steel Rod 7 4 Linear Actua...

Page 48: ...tion M12x50mm hexagonal bolt stainless steel M10 Washer Stainless Steel M12 washer Stainless steel M12x35mm hexagonal head bolt M12 washer Stainless steel M12x35mm hexagonal head bolt 7 6 40x20mm Prof...

Page 49: ...ings in materials HRD KMY C0018 KAHV Sealant NP1 Light Brown to block the passage of water through the surface or joints or openings in materials HRD KMY C0018 AKAH Sealant Black to block the passage...

Page 50: ...round wall ceiling HRD CVT G1062 PSMZ M12 Washer Stainless Steel part to to fix and stabilaze products to ground wall ceiling HRD PUL G0003 PSMZ M30 Washer Galvanized part to to fix and stabilaze prod...

Page 51: ...piral grinder 1 pc Batery driller 1 pc Electric impact drill 1 pc Lighting 2 pc Extansion lead 2 pc Ladder 2 pc Tape measure 5m 1 pc Tape measure 10m 1 pc Water gauge 2 pc Laser Meter 1 pc 35 cm angle...

Page 52: ...Set Plastic hammer 1 pc Iron hammer 2 pc Electrical screw driver 2 pc Cutter 1 pc Slicon gun 2 pc Bits 2 Set PH2X100 Bits 2 pc APEX 493 A Bits 2 pc Insulating Tape Black 6 pc Insulating Tape White 6...

Page 53: ...should be checked if the product is energized The power must be discon nected and connected again Please call our technical service if nothing changes at lights Part of the lights is not on Please cal...

Page 54: ...ared by all of our employees Our efforts aimed at offering its customers products they can use for many years with great satisfaction has turned Palmiye into one of the leading brands in national and...

Page 55: ...55...

Page 56: ...56 www palmiye eu...

Reviews: