7
BOM ID
Description
Qty
1
Gutter Gasket
1
2
Gutter Sealant Cap
2
3
M10x60 Stay Bolt
10
4
Integrated Gutter
1
5
Stay Bolt For Back Covering
1
6
M6x40 stay Bolt
2
3. PACKAGING
3.1. Preliminary Checks
On receipt of the packed goods and before starting their assembly, check the integrity of the
material and the presence of all the components necessary for the installation.
In case of anomalies, immediately stop the work and contact with hospital.
Fixing elements such as screws, plugs etc. are included in the box.
If not please contact service department of Palmiye.
Do not use a knife to avoid the risk of ruining the paint or other materials.
3.2. Packed Parts
3.2.1. Integrated Gutter
.
6
Summary of Contents for Skyroof Plus
Page 1: ...1 Installation Manual Skyroof Plus...
Page 5: ...5 2 TERMINOLOGY...
Page 22: ...22 Place rear covering to rear integrated gutter...
Page 26: ...26 4 4 Back covering for wall installation Place the back covering profile Z bended...
Page 31: ...31 4 8 Corner Cap Place the Corner Cap on the top of the integrated gutter s joint point...
Page 35: ...35...
Page 55: ...55...
Page 56: ...56 www palmiye eu...