26
5. PROGRAMMING / RESETTING OF MOTOR AND LIGHTS
5.1. Attention
The installation and initial setup procedures are the responsibility of a specialized technician.
When bioclimatic pergola system is mounted, check the connection of drive system which is
control box - actuator and also actuator – 40x20mm aluminium profile.
Power supply (120 or 230VAC / 50~60 Hz)
•
All wiring must conform to NEC (National Electrical Code) and local codes.
•
The Control Unit Boxes can be wired in PARALLEL.
•
A means of disconnecting the power at each motor independently should be provided.
•
Power only needs to be supplied to the Control Unit Box. The receiver is completely
enclosed inside the Control Unit Box.
•
PALMIYE Reserves the right to void the motor warranty if wiring recommendations are
not followed.
•
The Control Box works 120 or 230 V AC / 50~60 Hz
Installation Requirements
•
If the installation is made up of several RTS system, only one RTS system must be powered
during programming. All other RTS systems must be disconnected. This will avoid
interferences during the initial programming of each motor.
•
Use only SOMFY RTS radio controls. The receiver (433,42 MHz) must be programmed with
transmitters.
Control Box Button Configurations
*These colors only schematic. In real parts always Grey color
Summary of Contents for Skyroof Compact
Page 1: ...1 Installation Manual Skyroof Compact ...
Page 29: ...29 ...
Page 48: ...48 www palmiye eu ...