background image

Installation manual 

 

 
 

 

Preparation of components: 

Sort the components based on 
the wall plans (see Technical 
specifications) and place them 
at the four sides of the house in 
the installation sequence. 

ATTENTION:

 Never place the 

components directly on grass or 
a muddy surface because it will 
be very difficult or even 
impossible to clean them up 
later! 

 

 

Foundation 

A good foundation is the most important aspect guaranteeing the duration and safety of your house. 
Only a completely level and bearing foundation will ensure problem-free installation of the house, its 
stability and especially the matching of the doors. With a good foundation, your house will stand for 
many years more.  

Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At 
the same time make sure that there are sufficient air apertures under the house floor for ventilation.  

We recommend the following foundation options: 

 

Strip or spot foundation 

 

Foundation from concrete or pavement slabs 

 

Cast concrete bed 

Prepare the foundation so that the foundation joists are propped up on every side with intervals not 
exceeding 50-60 cm. 

Consult an expert in this field or have the foundation prepared by specialists. 

 

3 Garden house assembly 

 

ATTENTION:

  

¾

  You will find included in the house package one spare log (longest wall log). 

¾

  You will find included in the house package one spare board (longest roof or floor board). 

¾

  The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm 

long). 

All of the details listed above ARE NOT mentioned in the specification list. 

¾

  The drawings have the details marked with three-digit position numbers. The exact positions of 

those details that have the third digit “x” can be found in the specification list. 

Summary of Contents for PA28-3030-3

Page 1: ...ladas Con el fin de evitar posibles problemas durante el montaje hecho por usted o por la empresa de construcci n de su elecci n le recomendamos revisar el paquete entregado con la lista de piezas ant...

Page 2: ...st cz ci zamieszczonych w zestawie Kontroli kompletno ci zestawu nale y dokona w ci gu 14 dni od dostarczenia przesy ki Reklamacje obj te gwarancj ograniczaj si do wymiany wadliwych element w Wadliwe...

Page 3: ...Telefon Puhelin Telefon Telefoon Telefone Telefon Telefon Telefonas T lrunis Telefon Forwarder Pick up Others Afhalen Spedition Selbstabholer Par Transporteur Propres moyens Entrega Transporte organi...

Page 4: ...kod K sittelyvaihtoehdot yksik n koodi Behandlingsmuligheder artikel nummer Behandelingsopties artikelnummer Op es de tratamento c digo do artigo Povrchov pravy k d polo ky Mo liwo ci leczenia kod pro...

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ...A A A A 40 TU28 61P 009 010 Rel 1 3 5x50 x3...

Page 18: ...3 5x50 3 5x50 010 009 5x90 x3 5x90 x3...

Page 19: ...2 5x50 3 5x50 5x90 5x90 3 5x40 3 5x40 UPx RoRx...

Page 20: ...RoR1 RoR1 RoR2 RoR2 RoR5 RoR3 RoR4 RoR6 RoR6 RoR4 RoR3 RoR5 UP2 UP3 UP1 UP1 UP1 UP2 UP1 UP1 UP1 UP3 QNU105x105x90Zn x4 5x40 4 4 x4 M10x70 1 x4 10 1 2 1 5x90 3 1...

Page 21: ...di tetto NO Takborder SE Takbr dor FI Kattolaudat DK Tagbr dder NL Dakbeschot PT T buas de telhado CZ D ev n desky na st echu PL Deski dachowe LT Stogo lentos LV Jumta d i RU ET Katuselauad RB1 x RoRx...

Page 22: ...Pst2 Pst1 Sla1...

Page 23: ...5x90 4pcs 5 1 2 5 50...

Page 24: ......

Page 25: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 26: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 27: ...same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pa...

Page 28: ...CE To ensure protection from wind and storm it is recommended to attach the foundation joists to the foundation for this you can use for instance metal angles anchors etc The corresponding materials a...

Page 29: ...logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall p...

Page 30: ...the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push th...

Page 31: ...w place the pos PR2 and PR3 from the top to the purlin and from the bottom to the upper wall log Fixate the U Profile boards between the purlins and on the walls Start placing the roof boards with the...

Page 32: ...d adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do no...

Reviews: