background image

Installation manual 

 

 
 

 

 Garden house painting and maintenance 

Wood is a natural material, growing and adapting depending on weather conditions. Large and small 
cracks, colour tone differences and changes, as well as a changing structure of wood are not errors, 
but a result of wood growing and a peculiarity of wood as a natural material.  
 
Unprocessed wood (except for foundation joists) becomes greyish after having been left untouched for 
a while, and can be turn blue and become mouldy. To protect the wooden details of your garden 
house, you must immediately process them with a wood preservative.  
 
We recommend that you cover the floor boards in advance with a colourless wood impregnation 
agent, especially the bottom sides of the boards, to which you will no longer have access when the 
house is assembled. Only this will prevent moisture penetration. 

 

We definitely recommend that you also process the doors and windows with a wood impregnation 
agent, and do that namely both inside and outside! Otherwise the doors and windows can become 
twisted.  

After the house assembly is completed, we recommend for the conclusive finishing a weather 
protection paint that will protect wood from moisture and UV radiation.  

When painting, use high quality tools and paints, follow the paint application manual and 
manufacturer’s safety and usage instructions. Never paint a surface in strong sunlight or rainy 
weather. Consult a specialist regarding paints suitable for unprocessed softwood and follow the paint 
manufacturer’s instructions.  

Having been properly painted, your garden house’s lifetime will increase substantially. We recommend 
that you inspect the house thoroughly once every six months.  

 

2  Preparation for assembly 

 

Tools and preparation of components 

To assemble the garden house, you will need the following tools: 

 assembly aid 

 water-level 

 

knife 

 

 

ladder 

 screwdriver 

 measuring tape 

  

 

 hammer  

 

saw 

 pliers 

 drill

 

 

ADVICE:

 To avoid splinters, we recommend that you wear the corresponding protective gloves during 

the assembly process. 

 

Summary of Contents for PA28-3030-3

Page 1: ...ladas Con el fin de evitar posibles problemas durante el montaje hecho por usted o por la empresa de construcci n de su elecci n le recomendamos revisar el paquete entregado con la lista de piezas ant...

Page 2: ...st cz ci zamieszczonych w zestawie Kontroli kompletno ci zestawu nale y dokona w ci gu 14 dni od dostarczenia przesy ki Reklamacje obj te gwarancj ograniczaj si do wymiany wadliwych element w Wadliwe...

Page 3: ...Telefon Puhelin Telefon Telefoon Telefone Telefon Telefon Telefonas T lrunis Telefon Forwarder Pick up Others Afhalen Spedition Selbstabholer Par Transporteur Propres moyens Entrega Transporte organi...

Page 4: ...kod K sittelyvaihtoehdot yksik n koodi Behandlingsmuligheder artikel nummer Behandelingsopties artikelnummer Op es de tratamento c digo do artigo Povrchov pravy k d polo ky Mo liwo ci leczenia kod pro...

Page 5: ......

Page 6: ......

Page 7: ......

Page 8: ......

Page 9: ......

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ...A A A A 40 TU28 61P 009 010 Rel 1 3 5x50 x3...

Page 18: ...3 5x50 3 5x50 010 009 5x90 x3 5x90 x3...

Page 19: ...2 5x50 3 5x50 5x90 5x90 3 5x40 3 5x40 UPx RoRx...

Page 20: ...RoR1 RoR1 RoR2 RoR2 RoR5 RoR3 RoR4 RoR6 RoR6 RoR4 RoR3 RoR5 UP2 UP3 UP1 UP1 UP1 UP2 UP1 UP1 UP1 UP3 QNU105x105x90Zn x4 5x40 4 4 x4 M10x70 1 x4 10 1 2 1 5x90 3 1...

Page 21: ...di tetto NO Takborder SE Takbr dor FI Kattolaudat DK Tagbr dder NL Dakbeschot PT T buas de telhado CZ D ev n desky na st echu PL Deski dachowe LT Stogo lentos LV Jumta d i RU ET Katuselauad RB1 x RoRx...

Page 22: ...Pst2 Pst1 Sla1...

Page 23: ...5x90 4pcs 5 1 2 5 50...

Page 24: ......

Page 25: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 26: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 27: ...same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pa...

Page 28: ...CE To ensure protection from wind and storm it is recommended to attach the foundation joists to the foundation for this you can use for instance metal angles anchors etc The corresponding materials a...

Page 29: ...logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall p...

Page 30: ...the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push th...

Page 31: ...w place the pos PR2 and PR3 from the top to the purlin and from the bottom to the upper wall log Fixate the U Profile boards between the purlins and on the walls Start placing the roof boards with the...

Page 32: ...d adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do no...

Reviews: