6.
Select
Aux Electrodes
. The screen will change to:
SELECT ELECTRODE
Æ
1:TURB l 4:N/A
2:EMPTY l 5:N/A
3:N/A l 6:N/A
The TURB electrode should have been assigned to AUX socket 1
when it was fitted. Press the OK or right arrow key to select TURB.
The screen will change to:
CALIBRATE TURB
Æ
Pt-1? [01/Jan/12]
Pt-2? [01/Jan/12]
Calibration point 1 (Pt-1) is the Zero NTU point. Calibration point 2
(Pt-2) is the 1000 NTU point.
The dates shown to the right of each point are the dates of the last
successful calibration.
7.
Select Pt-1. The screen will change to:
PLEASE WAIT
Stabilising
000%
The Meter will wait until the readings are stable, then it will send
the calibration command to the Probe, where the calibration takes
place. During calibration, the Calibrating screen is displayed and the
progress counter counts up. If the calibration is successful, the
counter will reach 100% and the following screen will be displayed.
Offset:1138mV
Calibrating
100%
Press [OK]
The Calibration Report on the top line displays the voltage output
from the Turbidity Receiver Electrode in millivolts (mV). This value
is not stored in memory so should be noted down in a calibration
record book for the probe.