
O
PERATION
M
ANUAL
VKL
10
/100
V
ERSION
V005-06-2020
5
1. Delivery
1.1.
Delivery Check
Please verify immediately after unpacking of equipment, if delivery is complete. Besides the
dilution stage itself, the following items must be part of the delivery:
1 suction nozzle
4 transport covers (yellow plastic parts, installed at the equipment)
1 box spanner, size 14 mm (nut)
1 tube connector for the excess aerosol outlet (black plastic part).
Fig.: 1.1 VKL 10