4
Initial commissioning
28
5200-en_V2.0_06/20
4
Initial commissioning
4.1
Overview
Initial commissioning of the device includes the following tasks:
• Set up and connect the device. The process is explained over the next
few pages.
• Adjust the operating system settings to suit your location. This includes:
- Time and date settings
- Network address
- Number formats
• Calibrate and verify the measuring system; refer to section "
and calibrating measuring system [
Setup time: The tasks listed above take about two hours to complete.
4.2
Setting up and connecting Fidas 200
Setting up and connecting controller
1. Set up the controller in a suitable place within the measuring station.
2. Plug the weather station cable into the receptacle “weather station” on
the back of the controller.
3. To connect to a network: Connect a network cable.
4. Connect the network cable but do not switch it on yet.