8
Acr Pro
air curtains
Operation and Maintenance Documentation
Horizontal assembly:
Vertical assembly:
To mount the curtain horizontally in a proper way, keep the dis-
tance of min. 300mm from the rear side of the device.
To mount the
ACR Pro
curtain to the ceiling, use the
ACR Pro
multi-purpose connector. Mounting pins of diameter 11 may be
attached to the connector (not included in the delivery).
To mount the curtain vertically make sure the air outlet of the
curtain is as close as possible to the doorway and air gap is at
the height of the upper edge of the entry. Please, make sure to
keep the distance of about 300 mm between the outlet
casing and the wall.
To mount two
ACR Pro
curtains one above the other, it is neces-
sary to use the
ACR Pro
multi-purpose connector to install the
curtain to the wall.
To mount
ACR Pro
curtain to the floor, use vertical holder/sup
-
port, which is used to attach the curtain to the EURO pallet (for
the period of transport). The support is included in the delivery.
The curtain must be attached to the floor from each side and its
rear side as shown in Figure.