background image

16

Acr Pro 

air curtains 

Operation and Maintenance Documentation

10.

    OPERATION AND MAINTENANCE

The engine and fan used in the 

ACR Pro

 air curtains are maintenance-free devices but regular check-ups are advised, especially mo-

tor and bearing (fan’s rotor should rotate freely, free from any axial and radial throws/run-outs and undesired knocks/rattles.

The heat exchanger requires systematic cleaning all dirts /impurities off. Before the start of the heating period, the heat exchanger is 

advised to be cleaned with compressed air directed to the air outlets; there is no need for dismantling the device. Pay special attention 

when cleaning the exchanger’s fin due to high possibility of damaging them. If the fin is bent, use a special tool. If the device has not 

been used for a longer period of time, unplug it before the next use.

The heat exchanger is not equipped with any anti-freeze protection device. The heat exchanger may be damaged if the room

temperature goes below 0°C.

If the device is to operate in a room where the temperature goes below 0°C, anti-freeze liquid must be added to the water circulation/

system. Anti-freeze liquid must be appropriate for the material the exchanger is made of (copper), as well as other elements of the hy-

draulic system/circulation. The liquid must be diluted with water accordingly to the manufacturer’s recommendation.

NOTICE !

•  Any and all repair and maintenance works must be conducted with the power off and the heat 

input disconnected.

•  Only  suitably  qualified  staff  well  acquainted  with  the  safety  regulations  concerning  handling 

with an electrical device must be employed when the device is being installed, started and op

-

erated 

•  In the event of coolant leak, when the water system is under pressure, any repairs of the leak

-

age are strictly prohibited.

•   Any repairs of the device must be conducted only if the device is disconnected from the power 

supply.

•   If the device being operated gives metallic clatter, vibration or the level of noise is increasing, 

check if the mounting of the fan has not become loose – in case of any problems contact the 

installer of the device or the authorized Service immediately.

 

9.

    WATER CONNECTION

11.

    SPARE PARTS

Fan

1 pcs. PTC panel

Hot water exchanger 

(1500 or 2000)

Side panel

Top/bottom panel

Top cover panel

Contactor

Water connections are located at the back of the unit on the right side. Connections should allow access for service and maintenance 

therefore on both nozzles the shut-off valves should be installed. The order of connecting inlet/outlet pipes does not affect the operation 

of the exchanger.

Summary of Contents for ACR PRO

Page 1: ...eration and Maintenance Documentation www pakole com ACR_Pro_008_025_011_210617_V004_EN Type ACR Pro ACR Pro 1500H ACR Pro 2000H ACR Pro 1500C ACR Pro 2000C ACR Pro 1500E ACR Pro 2000E ACR PRO AIR CUR...

Page 2: ...SAFETY PRINCIPLES 3 2 PURPOSE OF THE DEVICE 4 3 BASIC TECHNICAL PARAMETERS 4 4 DIMENSION 5 5 HEAT OUTPUT RANGES 6 6 ASSEMBLY 7 7 CONTROLLER INSTALLATION 9 8 ELECTRICAL CONNECTION DIAGRAMS 11 9 WATER C...

Page 3: ...tain is connected directly to the cable please make sure there is a splitter protecting against any undesired discon necting Pay special attention while transporting the device not to damage the casin...

Page 4: ...ehouse and production halls Loading unloading sections in supermarkets and large commercial premises Car showrooms and service stations exhibition surfaces 3 BASIC TECHNICAL PARAMETERS for water param...

Page 5: ...5 Acr Pro air curtains Operation and Maintenance Documentation 4 DIMENSIONS ACR Pro 1500H ACR Pro 1500E ACR Pro 1500C ACR Pro 2000H ACR Pro 2000E ACR Pro 2000C...

Page 6: ...n the heaters surface as well as larger energy exchange surface ACR Pro 1500H inlet outlet water temperature 60 40 70 50 80 60 90 70 inlet air temperature 0 5 10 15 20 0 5 10 15 20 0 5 10 15 20 0 5 10...

Page 7: ...work is possible to be conducted On both connection nozzles manual shut off valves should be installed in case of the necessity of disconnecting the unit The hot water medium supply must be connected...

Page 8: ...utlet of the curtain is as close as possible to the doorway and air gap is at the height of the upper edge of the entry Please make sure to keep the distance of about 300 mm between the outlet casing...

Page 9: ...UARD PRO Control room temperature by opening closing the vale or by adjusting air volume automatically Antifreeze mode protection against dropping room temperature below critical level 5 15 C Possibil...

Page 10: ...FAN Change of the fan speed to low medium high or automatic Hold FAN for 5 seconds Manual calendar programming Monday Friday Saturday Sunday 6 settings per day BMS Functions When Panel Intelligent is...

Page 11: ...ating Power cable and a main switch are not included in the set Also the DOORSTOP door contact switch can be installed it turns off the ACR Pro curtain when the door is being closed and the mo ment th...

Page 12: ...curtains Operation and Maintenance Documentation 8 1 Connection scheme for 1 unit ACR Pro H or C type with Comfort controller ACR Pro E 8 2 Connection scheme for 1 unit ACR Pro E type with Comfort con...

Page 13: ...urtains Operation and Maintenance Documentation 8 3 Connection scheme for ACR Pro H or C type with custom controller 8 4 Connection scheme for ACR Pro E type with custom controller ACR Pro ACR Pro ACR...

Page 14: ...Acr Pro air curtains Operation and Maintenance Documentation 8 5 Connection scheme for 6 unit ACR Pro H or C type with Multi 6 and Comfort ACR Pro ACR Pro ACR Pro ACR Pro ACR Pro ACR Pro ACR Pro ACR P...

Page 15: ...Pro air curtains Operation and Maintenance Documentation 8 6 Connection scheme for 6 unit ACR Pro E type with Multi 6 and Comfort ACR Pro E ACR Pro ACR Pro E ACR Pro E ACR Pro E ACR Pro E ACR Pro E AC...

Page 16: ...s made of copper as well as other elements of the hy draulic system circulation The liquid must be diluted with water accordingly to the manufacturer s recommendation NOTICE Any and all repair and mai...

Page 17: ...suitable part and mending which is done by not authorized retailer or service station The regular maintenance is the owner s responsibility The manufacturer does not assume the responsibility in case...

Page 18: ......

Page 19: ......

Page 20: ...PAKOLE TRADE Kft H 8000 Sz kesfeh rv r B rg ndi t 8 10 www pakole com mail pakole hu Tel 36 22 316 484 Fax 36 22 316 074 www pakole com...

Reviews: