![PairGain PG-Flex FRC-754 L4 Manual Download Page 13](http://html1.mh-extra.com/html/pairgain/pg-flex-frc-754-l4/pg-flex-frc-754-l4_manual_3313549013.webp)
363-754-104-01, Revision 01
Installation and Test
PG-Flex FRC-754 List 4
June 22, 1998
9
Verify Installation
After the PG-Flex system is powered up and HDSL communication is synchronized:
1
Verify that the front panel ACTIVE indicators are all OFF and the FAULT indicator is OFF (no calls are in
progress).
2
Test the loop start circuits, as follows:
•
Place an outgoing call for each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications)
•
Place an incoming call to each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications)
3
Test the ground start circuits, as follows:
•
Place an outgoing call for each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications)
•
Place an incoming call to each subscriber circuit provisioned, and verify that the ACTIVE LED tracks
the progress of the call (refer to
for front panel indications)
Summary of Contents for PG-Flex FRC-754 L4
Page 17: ......