
2015
OPERATIONS
MANUAL
58
LOAD THE FILM
SLIDE THE FILM ROLL SHAFT
THROUGH THE FILM CORE AND
TIGHTEN DOWN USING A ¼” ALLEN
WRENCH.
ENSURE THE ROLL IS UNWINDING
TOWARDS THE FRONT OF THE
MACHINE.
TIGHTEN BY TURNING ALLEN
WRENCH A ¼” TURN COUNTER
CLOCKWISE.
CENTER THE FILM
THE FILM SHOULD RIDE ON THE
CENTER OF THE CARRIAGE.
USING A ¼” T HANDLE, LOOSEN THE
CHUCK AND SLIDE LEFT OR RIGHT
TO CENTER.
OPEN THE NIP ROLLER
THE NIP ROLLER LEVER IS LOCATED
BEHIND THE ELECTRICAL CABINET OF
YOUR MACHINE.
UP IS
(OPEN)