background image

6

SUPER-SD1

220206-20

22"

12"

18"

30"

25"

11"

11"

20"

16"

26"

14"

15"

5"

10"

16"

18"

28"

4"

4"

8"

28"

18"

16"

8"

22"

8"

Mobile Home Installation

Minimum

Clearance to

Combustibles

Procedure:

CAUTION: THE STRUCTURAL INTEGRITY OF THE
MOBILE HOME FLOOR, WALL AND CEILING/ROOF
MUST BE MAINTAINED.

Note: See "Combustion Air" section onpage 9.
1. Position stove and floor protection with hole for combus-

tion air in accordance with the clearances as stated on the
label and in Figure #1.

2. Mark the position for the hole in the ceiling and roof by

using a string and plumb-bob.

3. Check that the intended location will not interfere with floor

joists, ceiling joists or rafters before proceeding further.

4. Cut a hole in the ceiling and roof to suit the chimney system

and frame in the sides. The chimney support is mounted to
the framing.

5. Assemble chimney sections so the finished length is resting

on the support and protruding through the roof. Avoid
having joints between ceiling and roof.  Install radiation
shield. Assemble flashing and storm collar and be sure to
maintain the vapour barrier at this point. (Seal securely.)
Attach rain cap and check flashing for leaks.

6. Install connector as per manufacturer's instructions.
7. Attach stove to flooring using two 1/4" x  2" or longer lag

screws.

Warning:

 Under no circumstances is this heater to be installed

in a makeshift or "temporary" manner. It may be fired only after
the following conditions have been met.

DO NOT CONNECT THIS UNIT TO A CHIMNEY

FLUE SERVING ANOTHER APPLIANCE.

DO NOT INSTALL IN A SLEEPING ROOM.

- Outside air supply must be used for Mobile Home installations

see Figure #2, Page 7.

- The services of a competent or certified installer, (certified by
the Wood Energy Technical Training program (WETT) - in
Canada, Hearth Education Foundation (HEARTH) - in U.S.A.,)
are strongly recommended.

Clearances

This heater must be installed with listed double-wall connector
and compatible chimney system listed on page 7.
Clearances to combustible surfaces and materials are shown
below in Figure #1 and Figure #2, page 7.
Clearances may be reduced with various heat insulating mate-
rials. Consult local fire codes and authorities for approval.

NOTE:

 Longer chimney lengths and different pitch flashings

may be used. All other parts listed must be installed (see Figure
#2, Page 7). Install all components to the connector or chimney
manufacturer's installation requirements. Consult your chim-
ney supplier for installation advice.

FIG. #1

Double Wall Connector - Residential

Single Wall Connector - Residential

Alcove: Min. Height  7 1/2'

Max. Depth  4'

Double Wall Connector - Mobile Home

Summary of Contents for SUPER 27 SPECTRUM

Page 1: ...GUIDE Design D Models SUPER 27 SPECTRUM SPECTRUM CLASSIC PLEASE SAVE THESE INSTRUCTIONS SAFETY NOTICE Ifthisstoveisnotproperlyinstalled a house fire may result For your safety follow the installation...

Page 2: ...Procedure 8 Floor Protector 9 Combustion Air 9 Operation 10 Wood Selection 10 How to Test Your Wood 10 Lighting for the First Time 10 Lighting a Fire 10 Normal Operation 10 Restarting After Extended...

Page 3: ...nwoodandtoo slow a burning rate This heavy deposit is building up at least as quickly in the chimney WARNING ONLY USE MATERIALS SUPPLIED BY MANUFACTURER WHEN DOING MAINTE NANCE OR REPLACEMENTS 4 DOOR...

Page 4: ...ust be lived with Regular inspection and cleaning is the solution The use of dry seasoned wood and ample com bustion air will help to minimize the buildup Chimney Fires The result of excessive creosot...

Page 5: ...it in the upright position Super 27 only Assembly Crate Removal 1 Carefully remove wood top and supports 2 Remove plastic cover 3 Using a 7 16 wrench remove lag bolts that secure stove body to bottom...

Page 6: ...Attach stove to flooring using two 1 4 x 2 or longer lag screws Warning Under no circumstances is this heater to be installed inamakeshiftor temporary manner Itmaybefiredonlyafter the following condit...

Page 7: ...3 Energy Vent 7 Industrial Chimney Model Excel Ultra Black 4 Selkirk Metalbestos Model DS 8 Simpson Dura Vent Model DVL B As well as one of the following compatible chimney systems All parts 6 CANADA...

Page 8: ...tmeetalllocalcodes Donotconnectthisunittoachimney flue serving another appliance Minimum system height is 15 feet 4 6 m measured from base of appliance Double Wall Connector Use a listed double wall c...

Page 9: ...nt dislodging of the air duct Outside air may also be ducted from outside through the 4 diameter knockout hole in the rear of the pedestal or leg kit ash box enclosure If this method of supplying comb...

Page 10: ...es it is very important that the room be well ventilated Open all windows and doors Smoke and fumes caused by the curing process may cause discomfort to some individuals Lighting a Fire WARNING Never...

Page 11: ...om your Pacific Energy dealer Re install baffle assembly in reverse order The two side pieces of insulation must be tight against the siderails Restarting After Extended or Overnight Burns 1 Open door...

Page 12: ...will allow the fan to turn on as the stove heats up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manua...

Page 13: ...dup See 1 2 3 above Low Heat Output 1 Wood is wet Use dry wood 2 Fire too small Build a larger fire 3 Draft too low Chimney plugged or restricted inspect and clean Won t Burn Overnight 1 Air control i...

Page 14: ...Firebrick 4 x 4 1 2 x 1 1 4 1 pc 246 12d Firebrick 7 1 4 x 4 1 2 x 1 1 4 1 pc 245 All parts may be ordered from your nearest Pacific Energy dealer Contact Pacific Energy for the location of the deale...

Page 15: ...x 1 1 4 1 pc 248 14b Firebrick 3 x 4 1 2 x 1 1 4 1 pc 247 14c Firebrick 4 x 4 1 2 x 1 1 4 1 pc 246 14d Firebrick 7 1 4 x 4 1 2 x 1 1 4 1 pc 245 14e Firebrick 9 x 4 1 2 x 1 1 4 17 pc 5096 99 Firebrick...

Page 16: ...ss and thermal insulation Thehighmass weight actsasaheatstorageandthe thermal insulation keeps the combustion zone hot Activeflamingtakesplaceduringthefirstpartofthe burn During this stage heat is sto...

Page 17: ...on its back 5 Using a 3 4 wrench remove 1 x 1 2 bolts and save for later use 6 Remove pallet retaining brackets from stove bottom Pedestal Kit 1 With the unit on its back and the removable cover facin...

Page 18: ...equired tools two 1 2 wrench or socket or one 3 4 wrench or socket and one 3 8 wrench or socket one 7 16 wrench or socket Remove crate all models 1 Carefully remove wood top and supports 2 Remove plas...

Page 19: ...FRONT SIDES AND BACK AS INDICATED MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS COMPONENTS REQUIRED FOR MOBILE HOME AND ALCOVE INSTALLATION OUTSIDE AIR KIT AND ONE OF THE FOLLOWING LISTED CONNECTORS SEC...

Page 20: ...PACIFIC ENERGY FIREPLACE PRODUCTS LTD Box 1060 Duncan BC V9L 3Y2 Phone 250 748 1184 Web site http www pacificenergy net...

Reviews: