13
Set up the ST 85 system using the following steps and associated drawings.
1. Store the shipping container(s) in a
convenient location. Reuse of these
containers will prevent damage if you store
or ship the system.
2. Place the Power Switch in the “OFF” or “0”
position.
Stacking
ST 25, 45, 65 & 85 systems can be stacked one on
top of the other (up to 3 units high). Ensure that
the power sources are positioned as shown with
the recessed area in the bottom of the top power
source placed over the raised portion on top of the
bottom power source.
Set-Up
Set-up