![Pace PAI Installation And Assembly Manual Download Page 30](http://html1.mh-extra.com/html/pace/pai/pai_installation-and-assembly-manual_3109632030.webp)
SECTION 3 - HANDLING, STORAGE, AND INSTALLATION
PACE
│
Installation & Assembly Manual
Issue Date: 07/03/2018
30
Form PA102.20-N1
Figure 20 -
Shipping Split Examples Using Structural Steel Baserails
LD14263
WELDED CHANNEL FILLER
BASE CHANNEL
REMOVABLE LIFTING LUGS
BASE CHANNEL
3/4 in ZINC HEX NUT
(Use from Lifting Lug)
(No Flat or Lock
Washers Required)
3/4 in GR5 HEX BOLT
(Use from Lifting Lug)
Figure 21 -
Applying Gasket Square, Neoprene
Gasket and Caulk to Raceway Split
LD13372
NEOPRENE
GASKET
GASKET
SQUARE
RACEWAY
SPLIT
CAULK
9. Make sure all wiring and/or control tubing con-
nection pigtails are secured out of the path of the
shipping split mating surfaces to prevent damage.
10. Apply separate gasket squares (P/N 028-11883-
010) as shown in
. Place
one square at each corner of the face of each sec-
tion.
11. Apply neoprene gasket (P/N 028-11883-010 or
P/N 028-11873-010) to face the perimeter from
square to square, and 1/4 in. from the outside
edge of the mating surface (nearest to AHU exte-
rior) to allow for a 1/4 in. bead of caulk. The gasket
application should provide a continuos seal from
side-to-side, and to the top of the AHU roof to the
bottom of the AHU base where it meets the curb.
12. Apply a 1/2 in. thick bead of caulk (not provided),
to the curb top surface only, where the first section
will be placed.