Form PA102.20-N1
13
Installation & Assembly Manual │
PACE
Issue Date: 07/03/2018
1
SECTION 1 - GENERAL INFORMATION AND SAFETY
INTRODUCTION
The air handling unit (AHU) is manufactured to the
highest design and construction standards to ensure
high performance, reliability and adaptability to all
types of air handling installations.
This manual and any other document supplied with the
AHU are the property of PACE
™
, which reserves all
rights. This manual may not be reproduced, in whole
or in part, without prior written authorization from an
authorized PACE representative.
In addition, this manual:
• Includes suggested best working practices and
procedures, which are issued for guidance only,
and they do not take precedence over the above
stated individual responsibility and/or local safety
regulations.
• Contains all the information required for correct in-
stallation and commissioning of the AHU, together
with operating and maintenance instructions.
• Should be read thoroughly before attempting to
operate or service the AHU.
• Contains detailed procedures, including installa-
tion, commissioning and maintenance tasks that
must only be performed by suitably trained and
qualified personnel.
Rigging and lifting should only be done by a profes-
sional rigger in accordance with a written rigging and
lifting plan. The most appropriate rigging and lifting
method will depend on job specific factors, such as the
rigging equipment available and site needs. Therefore,
a professional rigger must determine the rigging and
lifting method to be used, and it is beyond the scope of
this manual to specify rigging and lifting details.
The manufacturer will not be liable for any injury or
damage caused by incorrect installation, commission-
ing, operation, or maintenance resulting from a failure
to follow the procedures and instructions detailed in the
manual.
WARRANTY
PACE warrants AHUs in accordance with the Limited
Warranty Engineered Systems Equipment procedure.
Refer to the
Standard Limited Warranty Engineered
Systems Equipment (Form PA50.05-NM2)
for more
information.
PACE warrants all equipment and materials against
defects in workmanship and materials for a period of
18 months from the date of shipment or 12 months
from the date of start-up, whichever comes first, un-
less labor or extended warranty has been purchased
as part of the contract.
The warranty is limited to parts only replacement and
shipping of any faulty part, or subassembly, which has
failed due to defects in workmanship and materials. All
claims must be supported by evidence that the failure
has occurred within the warranty period, and that the
AHU was operated within the designed parameters
specified.
All warranty claims must specify the AHU model, se-
rial number, order number, and run hours/starts. Model
and serial number information is printed on the AHU
identification plate.
The AHU warranty will be void if any modification to the
AHU is carried out without prior written approval from
PACE. For warranty purposes, the following conditions
must be satisfied:
• Only genuine PACE approved spare parts must
be used.
• All of the scheduled maintenance operations de-
tailed in this manual must be performed at the
specified times by suitably trained and qualified
personnel.
• Failure to satisfy any of these conditions will au-
tomatically void the warranty. Refer to
Standard
Limited Warranty Engineered Systems Equipment
(Form PA50.05-NM2)
for details.
RESPONSIBILITY FOR SAFETY
Every care has been taken in the design and manufac-
ture of the AHU to ensure compliance with the safety
requirements. However, the individual operating or
working on any equipment is primarily responsible for:
• Personal safety, safety of other personnel, and
the equipment.
• Correct utilization of the equipment in accordance
with the procedures detailed in this manual.