Section 5
Frame Layouts
5-10
12/11
D1
Dimension E (BOC to DPF/SCR) = 0 .0in
Dimension A (BOC to Air Dryer) = 7 .7in
Dimension B (BOC to Battery Box) = -5 .4in
TABLE 5-4.
Fuel Tank Size
Fuel Tank
Length (in)
Dimension F
BOC to Fuel Tank, (in)
Dimension D
BOC to DEF Tank (in)*
Diameter
Gallons
DEF Tank Size
Small
Medium
Rectangular
22”
Diameter Tank
56
35 .6
37 .5
19 .7
29 .5
N/A
75
47 .3
49 .2
100
62 .2
64 .1
Rectangular Tank
45
28 .0
29 .9
N/A
N/A
17
*The DEF tank is moved forward approximately 8.3” with a frame rail mounted air dryer.
Summary of Contents for Kenworth T170 Hybrid 2011
Page 1: ...Kenworth T170 T270 T370 and Hybrid 2011 Body Builders Manual...
Page 2: ......
Page 10: ...12 11 Section 1 Introduction Page Intentionally Left Blank...
Page 52: ...Section 3 Dimensions 3 34 12 11 Automatic Transmission Allison 3000RDS...
Page 53: ...3 35 Section 3 Dimensions 12 11 Manual Transmission...
Page 111: ...Section 5 Frame Layouts 5 40 12 11 Page Intentionally Left Blank...
Page 120: ...Section 6 Body Mounting 6 9 12 11 Page Intentionally Left Blank...
Page 128: ...Section 7 Frame Modifications 7 8 12 11 Page Intentionally Left Blank...
Page 165: ...Section 8 Electrical 8 37 12 11 FIGURE 8 31 Cab Load Center mPDC...
Page 170: ...Section 8 Electrical 8 42 12 11 Page Intentionally Left Blank...
Page 179: ...12 11 Kenworth Truck Company P O Box 1000 Kirkland WA 98083 425 828 5000...