4
MAN 9064377 EN V1
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: 70212626
DK-6600 Vejen
e-mail: [email protected]
LOCATION
Choosing the proper location is an important step before you begin to assemble the
structure.
The following suggestions and precautions will help you determine whether your
selected location is the best location.
•
Never erect the structure under power lines.
•
Identify whether underground cables and pipes are present
before
preparing the site
or anchoring the structure.
•
Location should be away from structures that could cause snow to drift on or around
the building.
•
Do not position the shelter where large loads such as snow and ice, large tree
branches, or other overhead obstacles could fall.
•
Your shelter’s cover can be quickly removed and stored prior to severe weather
conditions. If strong winds or severe weather is forecast in your area, we recommend
removal of cover.
After choosing a location, proper preparation of the site is essential. The following site
characteristics will help ensure the integrity of the structure.
•
The support structure must be level to properly and safely erect and anchor the frame.
•
Drainage: Water draining off the structure and from areas surrounding the site should
drain away from the site to prevent damage to the site, the structure, and contents of
the structure.
WARNING:
The individuals assembling this structure are responsible for designing and
furnishing all temporary bracing, shoring and support needed during the assembly
process. For safety reasons, those who are not familiar with recognized construction
methods and techniques
must seek the help of a qualified contractor.