10
MAN 9064377 EN V1
P. Lindberg A/S
Sdr. Ringvej 1
www.p-lindberg.dk
Tel.: 70212626
DK-6600 Vejen
e-mail: [email protected]
Foundation placement
As Figure 1 shows, each base plate (No. 5 & 7) is equipped with one piece of earth auger
(No.16A) and two pieces of stake peg (No.16), base plate (No.6 & 6A) with one piece of
earth auger (No.16A) and one piece of stake peg (No.16).
Method of placing earth auger
1.
Mark the auger hole through the base plate (No.5, 6, 6A & 7) by using the stake peg.
Move the base plates away and the mark determines where the auger will be.
2.
Use the handle kit to turn the auger into ground. Leave sufficient shaft over the
ground. Now place the base plates onto the auger through the holes and tighten the
washer and nuts through the thread over the shaft over the base plates.
Note
: The earth auger and stake pegs apply for normal conditions (soil), not suitable to
the rock ground, frozen soil, and concrete ground.
Figure 1