FUNCTION SUMMARY TABLE 

Jumper 

symbol 

Function 

Description of function 

without jumper 

with jumper 

TV 

Quick test 

Standard times (*) 

Accelerated times 

CF4 

Final charge time 

Final charge at 3 hours (*) 

Final charge at 4 hours 

AS5s 

Standard autostart 

Manual start 

Autostart after 5 seconds (*) 

AS3h 

Delayed autostart 

Autostart after 3 hours 

CPR 

Proportional charge 

No proportional charge (*) 

Proportional charge on 

CI11h 

Safety time 

Safety timer at 9 hours (*) 

Safety timer at 11 hours 

CEQ 

Equalisation charge 

Not programmed 

Programmed* 

*

 Default setting

 

 

CAUTION!

  : 

The card checks the setting of the jumpers when it turns on, namely when the charger is 

powered by mains.  To make modified settings effective with the board powered, the charger must be 
disconnected and then reconnected. 

 

CHAPTER 6:  DESCRIPTION OF THE CHARGE  

Once all connections (mains and battery) have been performed, the electronic card PBM 753 makes a 

lighting 

test of all the leds

. After this test just the 

L1

 

green led

 is on “

BATTERY CONNECTED

” and eventually the 

LED 

L5

  if also the equalizing charge is set. 

 

Charging curve 

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The charging characteristic shown above is made up of the following stages: 
 

Initial  charge: 

performed  with  decreasing  current  until  a  threshold  is  reached,  corresponding  to  the  gassing 

voltage set by means of the 

VGAS

 trimmer (standard value is 2.4V/cell). 

The initial charge may last 

9 or 11 hours max

 (depending on the setting of the CI11H jumper). 

If the initial charge is not completed within that time, the safety timer operates and the 

red L4 LED

 lights up to 

signal a FAULT. 
 

Final charge:

 begins when the 

yellow L2 LED

 (corresponding to a threshold equal to 2,4V/cell) lights up. 

It  is  performed  with  decreasing  current  and  goes  on  time-controlled (3 hours as default setting; 4 hours when 
the 

CF4h

 jumper is inserted). 

TIME 

100 

I (%) 

V/el. 

2,40 V 

2,00 V. 

INITIAL CHARGE 

MAX 9-11 h 

Safety timer 

FINAL CHARGE 

PAUSE 

50 

25 

EQUALIZATION 

2,70 V. 

5 impuls 

o o o 

5 impuls 

o o o 

5 impuls 

o o o 

15h 

15h 

Summary of Contents for SE

Page 1: ...I VIGNOLA MO ITALIA Tel 39 059 7705311 Fax 39 059 7705300 http www gruppopbm it e mail pbm gruppopbm it file Manuale SE PBM753 GB rev 1 doc TECHNICAL MANUAL FOR SE BATTERY CHARGER with PBM753 electro...

Page 2: ...TAGE AND CHARGING STAGES 4 4 1 CARD SETTING ON BATTERY CHARGER WITHOUT BATTERY 5 CHAPTER 5 BATTERY CHARGER FUNCTIONS 5 CHAPTER 6 DESCRIPTION OF THE CHARGE 6 FLOATING CHARGE 7 7 1 BATTERY DISCONNECTION...

Page 3: ...y charger operating range with rated voltage from 24V to 96V Card powered by mains only 24Vac ON OFF relay 24VAC 10A with contacts on connector Battery charger functions configuration jumpers set by t...

Page 4: ...ours the automatic start of the charger is enabled 3 hours after connection to power CPR Proportional charge CI11h Safety timer set at 11 hours instead of 9 which is the default setting CF4h 4h long f...

Page 5: ...the gassing voltage which may range between 2 3 and 2 5V cell By turning the one turn VGAS trimmer it is possible to set the gassing voltage with a very high accuracy as described in Chapter 4 1 The P...

Page 6: ...has permanently switched to the final charge stage the LED light will not go off any more even if the battery voltage falls below 2 40V cell In this case reset the mains and make the procedure again C...

Page 7: ...d CHAPTER 6 DESCRIPTION OF THE CHARGE Once all connections mains and battery have been performed the electronic card PBM 753 makes a lighting test of all the leds After this test just the L1 green led...

Page 8: ...on The system is very useful during holidays and week ends since it makes it possible to keep battery charged while preventing overcharging overheating and or water consumption FLOATING CHARGE At the...

Page 9: ...perates during the initial charge the battery charger stops the charging process and signals it by means of the red L4 LED which lights up constant To exit from all fault conditions the battery charge...

Page 10: ...ns voltage which is too high or too low compared with the rated value may result in big differences in the current delivered by the battery charger with following malfunction of the charger and lower...

Page 11: ...se F1 on the PBM753 card 3 Check the path of the charging cables making sure that there are neither bad contacts on plugs nor overheatings on parts of cables or cable terminals 5 Check the voltage pat...

Page 12: ...ES REMEDIES AND OR CHECKS TO BE PERFORMED THE CHARGER DELIVERS TOO MUCH CURRENT Mains very high Adjustments not correct Battery too low Wrong wiring of the Main Transformer 1 Make sure that the charge...

Page 13: ...ion characteristics suitable for the specific load K and D curves BURNT FUSE ON CARD Defective card or wrong power supply of the card 1 Make sure that the voltage battery is correct see Jumper J10 pos...

Page 14: ...n aluminium sheets which act as dissipaters To achieve different current capacities the bridge is made up of a variable number of diodes positioned in parallel on the same plate To test operation of t...

Page 15: ...anuale SE PBM753 GB rev 1 doc page 14 2 Make sure that there is an infinite diode by pointing the positive test prod on positive pole of bridge output and negative test prod on each phases input 3 Mak...

Page 16: ...e Manuale SE PBM753 GB rev 1 doc page 15 4 Make sure that there is an infinite diode voltage by pointing the positive test prod on the phases and negative test prod on the negative output of bridge In...

Page 17: ...130 150V CHAPTER 11 MAINTENANCE AND CLEANING All maintenance and cleaning processes have to be performed by qualified skilled and authorised personnel Since the battery charger is an electrical equip...

Page 18: ...400 420 440V 0 24V TR Three phase transformer TA series RD Diode rectifier bridge PTSxxx E SH1 Shunt 100A 100mV or 200A 100mV P1 ON OFF green button PBM753 Electronic control card with microprocessor...