
TECHNICAL MANUAL "SE" (PBM753)
Revision no. 1 dd. 01/02/2017
P.B.M.
S.r.l.
via Barella, Z.I. - VIGNOLA ( MO ) ITALIA Tel. + 39 (059) 7705311 Fax + 39 (059) 7705300
http://www.gruppopbm.ite-mail :
file:
Manuale SE PBM753 GB rev.1.doc
page 3
Figure 2b :
PBM753
– side of weldings
2.1: MAIN FEATURES OF THE PBM753 CARD
RL1 ON
:
Manual charge: connecting the jumper RL1 on, the relay is closed manually
Warning: the battery charger can be stopped manually only.
J2
Function selection
TV
Quick test (it allows to shortly check the operation of the battery charger: the internal clock is
accelerated and the charging process is simulated)
AS5s
Autostart with a delay of 5 seconds
AS3h
Autostart with a delay of 3 hours (the automatic start of the charger is enabled 3 hours after
connection to power)
CPR
Proportional charge
CI11h
Safety timer set at 11 hours (instead of 9, which is the default setting)
CF4h
4h-long final charge (instead of 3, which is the default setting)
CEQ
Equalizing charge
J9
2-position jumper to select the gassing voltage setting mode (
FIX
, fixed, or
REG
., adjustable)
J10
Selection of battery rated voltage (24V-36V-40V-48V-72V-80V-96V)
NOTE: ALL THE TIMES YOU CHANGES THE JUMPERS SETTING, RESET ALSO MAINS AND BATTERY!
VGAS
One-turn trimmer to set the gassing point (2,4V/cell)
RL1
ON-OFF relay
L5
LED indicating the EQUALIZING CHARGE (yellow)
L4
LED indicating a FAULT (red)
L3
LED indicating END OF CHARGE (green)
L2
LED indicating FINAL CHARGE (yellow)
L1
LED indicating BATTERY CONNECTED / CHARGING PROCESS (green)
F1
500 mA fuse, 5x20 fuse, as a protection on card power supply
P1
L1
L2
L3
L4
L5