4
Step 1 Choosing the Site
Select a sheltered camp site protected from the
wind that will not allow water to pond under
the tent floor. Clear a level area of all stones,
twigs, etc.
Step 2 Standing the beach
dome up
Remove the tent from the carry bag and
carefully release elastic strap, gently allow the
tent to unfold and open fully.
Step 3 Peg down the beach
dome
Position the tent facing the desired direction.
Peg out the corners of the tent. For peg point
locations, see Figure 1. Anchor the tent to the
ground by inserting the pegs through the loops
around the base of the tent at an angle of 45
degrees, see Figure 2. Firm but not tight. As you
work from one peg point to the other around
the tent base pull the floor firmly, but not tight.
Assembly Instructions
Figure 1
PLEASE NOTE
In severe conditions the tent should be
dismantled
Figure 2
45
o
Do not force the sprung
steel frame, follow
instructions carefully
Peg Point
Switch Back 2 Camo
Switch Back 2 Camo